.w <br /> 16 July 2009 <br /> AGE-NC Project No. 08-1606 <br /> Page 2 of 3 <br /> Currently, AGE has submitted the necessary drilling permits for all on-site well installations and is <br /> attempting to acquire access agreements with the owners of adjacent properties for off-site well <br /> instalations. On-site monitoring well installations are scheduled to take place the week of 20 July <br /> 2009. <br /> A continued effort is being made to obtain access agreements from adjacent property owners.Access <br /> agreements for the proposed locations of MW-15 through MW-17,have been denied by Mr.Vincent <br /> Erardi the owner of parcel 139-05-012 (see map attached). Additional efforts have been made to <br /> contact the property owner of parcel 139-05-008,which is a potential alternate location for proposed <br /> wells MW-15 through MW-17. AGE has been able to make contact with the property owner and <br /> begun discussions to gain access to the property for the proposed well installations. If the property <br /> verbally agrees to allow access, AGE will submit a work plan addendum to SJCEHD. <br /> AGE is also negotiating with the property owner of parcel 139-05-009 for the installation of <br /> proposed monitoring wells MW-13 and MW-14. The original proposed locations were not <br /> acceptable to the owner due to concerns of traffic and other access issues. AGE has proposed to <br /> modify the locations of the proposed wells out of the way of flowing traffic to the southeastern most <br /> corner of the property line. As of 16 July 2009,AGE is awaiting the final response from the property <br /> owner. If access agreements are signed by the property owner AGE will submit the applicable <br /> permits and commence with the proposed installations. If the access agreements are denied, AGE <br /> will submit alternate permits and move the locations into the city right-of way as proposed as an <br /> alternative in the SJCEHD-approved work plan. <br /> AGE will submit a technical report to SJCEHD upon completion of the well installations to present <br /> the findings and results. Included in the report will be recommendations for the next scope of work <br /> as applicable to the site. <br /> All wells,including the newly installed wells,will be monitored and sampled during the third quarter <br /> 2009 and subsequently semi-annually thereafter.AGE proposes the semi-annual monitoring events <br /> to occur in the third and first quarters with semi-annual monitoring reports to be submitted twice <br /> each year. Based upon the results of the monitoring event scheduled in the third quarter 2009,AGE <br /> will propose a reduction of sampling for specific wells in the site's ground water monitoring well <br /> network. <br /> Advanced GeoEnvironmental,Inc. <br />