Laserfiche WebLink
SPCC PLAN <br /> TABLE OF CONTENTS <br /> 1. INTRODUCTION <br /> 2. PLAN REVIEW A D AMENDMENT <br /> 3. NOTIFICATION F GOVERNMENT AGENCIES <br /> 4. OUTSIDE ASSIST NCE AND SERVICES <br /> 5. CERTIFICATION NFORMATION AND MANAGEMENT APPROVAL <br /> 6. CONTACT LIST—Internal Union Pacific Contacts,Government Agencies,Outside Assistance and Services <br /> 7. LOCATION REPO T(Includes: Location Description,Address, Phone,General Drainage, Petroleum Transfer <br /> Operations, Inspect ons&Records, SPCC Plan Procedures, Security Procedures,Spill History, Training Description) <br /> 8. FACILITY REPO TS for each facility at this location(Includes: Facility Description, Petroleum Use Description, <br /> Activities Descripti n,Access Route Descriptions, Flow Description,Facility Drainage,Containment Structures <br /> Description, Securi Systems,Escape'Route Description) <br /> 9. TANK REPORTS or each tank at this location(Includes: Tank Name,Tank Number,Tank Description,Access <br /> Route Description, aterial, Product, Dimensions,Volume,Year Installed, Position, Base Support,Annual Usage, <br /> Longitude, Latitude Proposed Removal Date, Inventory Method, Internal Heating Coil,Overfill Spill Protection,Spill <br /> Avoidance System,Response Time, Integrity Test Method,Test Frequency,Failure Probability, Failure Type,Flow <br /> Direction, Discharg Flow Rate,Ultimate Discharge Volume, Discharge Scenario Description, Corrosion Protection <br /> Description, Secon ary Containment Design, Secondary Containment Material, Precipitation Drainage System, <br /> Runoff Inspection, isposal Facility Inspection Frequency) <br /> 10. EQUIPMENT LIS <br /> „. <br /> 8/11/98 1:06 <br />