SPCC PLAN
<br /> TABLE OF CONTENTS
<br /> 1. INTRODUCTION
<br /> 2. PLAN REVIEW A D AMENDMENT
<br /> 3. NOTIFICATION F GOVERNMENT AGENCIES
<br /> 4. OUTSIDE ASSIST NCE AND SERVICES
<br /> 5. CERTIFICATION NFORMATION AND MANAGEMENT APPROVAL
<br /> 6. CONTACT LIST—Internal Union Pacific Contacts,Government Agencies,Outside Assistance and Services
<br /> 7. LOCATION REPO T(Includes: Location Description,Address, Phone,General Drainage, Petroleum Transfer
<br /> Operations, Inspect ons&Records, SPCC Plan Procedures, Security Procedures,Spill History, Training Description)
<br /> 8. FACILITY REPO TS for each facility at this location(Includes: Facility Description, Petroleum Use Description,
<br /> Activities Descripti n,Access Route Descriptions, Flow Description,Facility Drainage,Containment Structures
<br /> Description, Securi Systems,Escape'Route Description)
<br /> 9. TANK REPORTS or each tank at this location(Includes: Tank Name,Tank Number,Tank Description,Access
<br /> Route Description, aterial, Product, Dimensions,Volume,Year Installed, Position, Base Support,Annual Usage,
<br /> Longitude, Latitude Proposed Removal Date, Inventory Method, Internal Heating Coil,Overfill Spill Protection,Spill
<br /> Avoidance System,Response Time, Integrity Test Method,Test Frequency,Failure Probability, Failure Type,Flow
<br /> Direction, Discharg Flow Rate,Ultimate Discharge Volume, Discharge Scenario Description, Corrosion Protection
<br /> Description, Secon ary Containment Design, Secondary Containment Material, Precipitation Drainage System,
<br /> Runoff Inspection, isposal Facility Inspection Frequency)
<br /> 10. EQUIPMENT LIS
<br /> „.
<br /> 8/11/98 1:06
<br />
|