Laserfiche WebLink
Union Pacific Railroad <br />Facility Documents for VM -3 Engine Fueling Area <br />http://www. home. uprr. com/depts/EnvM gmt/Ceps/ cfm/ Reportsi In fo _P rint. c fm <br />Name: <br />VM -3 Engine Fueling Area Abbr: VM -3 <br />Type: <br />Maintenance Operations <br />Desc: <br />The VM -3 area includes the locomotive servicing platform and the <br />oil storage tanks that support the servicing process. <br />MP Start: <br />92 Lat: SbDv: Canyon <br />MP End: <br />Long: MoW Nbr: <br />Address: <br />Manager Locomotive Maintenance <br />Union f acific Railroad Company <br />833 East 8th Street <br />City: <br />Stocktoin County: San St: CA <br />Joaquin <br />Phone: <br />209 -94? -5205 Fax: Postal: 95206 <br />209-953-5276 Country: <br />Petroleum Use <br />Diesel fuel is stored in Tanl No. 6, surrounded by a containmwnt <br />Desc: <br />dike. Diesel is pumped through the pump skids into Tank No. 6 <br />and to the engine fueling rack in Area 4. Diesel fuel trucks unload <br />fuel to tide diesel storage tanks through the truck unload spot <br />adjacent to the diesel pumps. Flow from the unload spot is locally <br />contained by curbed concrete pads with drainage back to the <br />separation plant. <br />Activities Desc: <br />Access Route <br />Desc: <br />Flow Desc: <br />Most ofthe yard surface runoff is contained within the yard limits. <br />Flow wit in the area of the separation plant is directed back to the <br />oil trap f r recycling. Flow in Area 3 - Diesel Storage is directed to <br />the oil/woter separator for recycling. The drains in the containment <br />around ank No. 6 are normally closed. Th drain at the pump skid, <br />Truck U load Spot routes flow to the oil/water separator. <br />Facility <br />Drainag in the containment around Tank No. 6 in Area 3 is <br />Drainage Desc: <br />directed o the separation plant through a manually activated <br />pump in he floor of the containment. <br />Hazardous <br />Material Desc: <br />Hazardous <br />Waste Desc: <br />Containment <br />A containment with a volume greater than the total volume of <br />Structures <br />Tank No[ 6 is located in this area. Concrete pads with drainage <br />Desc: <br />e pump skids and diesel truck load and unload spots <br />beneath:spilled <br />contain during pumping processes. The drainage is <br />directed to the separation plant. <br />Security <br />Systems Desc: <br />Escape Route <br />Desc: <br />Comment: <br />