My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FIELD DOCUMENTS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
PACIFIC
>
4405
>
2900 - Site Mitigation Program
>
PR0542364
>
FIELD DOCUMENTS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/4/2020 3:33:58 PM
Creation date
5/4/2020 2:59:30 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
FIELD DOCUMENTS
RECORD_ID
PR0542364
PE
2960
FACILITY_ID
FA0024340
FACILITY_NAME
PACIFIC CAR WASH
STREET_NUMBER
4405
STREET_NAME
PACIFIC
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
APN
11024014
CURRENT_STATUS
01
SITE_LOCATION
4405 PACIFIC AVE
P_LOCATION
01
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
159
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
copies of these policies or certificates evidencing the same shall be filed with the Risk <br /> Manager of the Ci' fter approval of the City Attorney. <br /> 5 . The issuance of this permit by the City does not create any agency on the part of the <br /> permittee , and the permittee will hold the City of Stockton harmless for any action for <br /> damages arising out of the permittee's activities performed under this permit. <br /> 6. Permittee, or his contractor, shall obtain an Encroachment Permit for the installation of <br /> the well (s) . <br /> 7. Each completed well head shall be covered with a meter box or valve box as approved <br /> by the City of Stockton . The top of each box shall be flush with the surrounding ground <br /> or pavement. , <br /> 8 . The provisions of the State of California , Department of Water Resources Bulletin 74-81 <br /> entitled "Water Well Standards: State of California" shall be applicable to this permit. <br /> 9 . All drilling locations , methods , and well designs are to be approved by the California <br /> Department of Health Services and the Central Valley Regional Water Quality Control <br /> Board , <br /> 10 . Drilling operations that create loud noise shall be confined between the hours of 7 a . m . <br /> and 6 p . m . <br /> 11 . Portable mud tanks are to be used . <br /> 12 . Disposal of water from the well. development shall be in accordance with current federal <br /> regulations . <br /> 13 . Blocking or barricading City streets shall be subject to the approval of the City Traffic <br /> Department. Traffic cones and warning signs shall be used to direct traffic. <br /> 14 . Upon completion of water monitoring , the well shall be abandoned in accordance with <br /> the requirements of the San Joaquin Local Health District. <br /> 15 The permittee shall not close any traveled lane to facilitate installation , maintenance , or <br /> sampling of the well (s) . <br /> JAMES B . GIOTTONINI <br /> PUBLIC WORKS DIRECTOR <br /> CITY OF�STTOOjCKTON <br /> C� <br /> GREGG S . MEISSNER <br /> SENIOR TRANSPORTATION PLANNER <br /> CITY OF STOCKTON <br /> i <br />
The URL can be used to link to this page
Your browser does not support the video tag.