My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0008063
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
PACIFIC
>
4405
>
2900 - Site Mitigation Program
>
PR0542364
>
ARCHIVED REPORTS_XR0008063
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/4/2020 3:46:57 PM
Creation date
5/4/2020 3:17:32 PM
Metadata
Fields
Template:
EHD - Public
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
23 April 2001 <br /> AGE-NC Project No 96-0229 <br /> Page 7 of 7 <br /> the specified zone, then withdrawn approximately three feet to expose an Inlet screen The Interior <br /> of the sampling tool fills with water and a 1-Inch outer diameter(O D ) stainless steel bailer will be <br /> lowered and utilized to extract a ground water sample Grab ground water samples will be collected <br /> in Intervals of porous and permeable material All rinseate generated during drilling activities will <br /> be containerized in properly labeled DOT-approved 55-gallon drums, and was stored on-site in an <br /> area Iacking public access <br /> Following sample collection, the samples will be placed in laboratory-supplied containers and <br /> transported under chain-of-custody to a DHS-certified laboratory <br /> Proposed soil boring locations are Illustrated on Figure 2 Following borehole advancement,portland <br /> cement(grout mix)will be utilized to backfill each borehole utilizing a tremie pipe The PHS-EHD <br /> will be notified at least 48 hours in advance of field work and given the opportunity to Inspect the <br /> grout mix prior to backfilling activities <br /> 4 2 EQUIPMENT DECONTAMINATION <br /> SAll sampling tools used for sample collection will be thoroughly rinsed with clean water after being <br /> washed with a solution of Alconox All down-hole drilling and sampling equipment will be pressure <br /> washed prior to starting each boring <br /> 43 SAMPLE HANDLING <br /> Ground water samples will be collected into laboratory supplied containers Ground water samples <br /> for TPH-g, BTEX and fuel oxygenate(EPA 8260) analyses will be collected into 40-m1 VOA vials <br /> containing 0 5 ml of hydrochloric acid as preservative Following collection the samples will be <br /> appropriately labeled and placed on ice and kept In a cooler until delivered to the laboratory for <br /> analysis Cham-of-custody protocols will be used to document sample custody transfer from the field <br /> to the analytical laboratory A chain-of-custody form will accompany the samples <br /> Advanced GeoEnvaron mental,Inc <br />
The URL can be used to link to this page
Your browser does not support the video tag.