My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0008086
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
PACIFIC
>
4405
>
2900 - Site Mitigation Program
>
PR0542364
>
ARCHIVED REPORTS_XR0008086
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/4/2020 3:45:23 PM
Creation date
5/4/2020 3:22:58 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0008086
RECORD_ID
PR0542364
PE
2960
FACILITY_ID
FA0024340
FACILITY_NAME
PACIFIC CAR WASH
STREET_NUMBER
4405
STREET_NAME
PACIFIC
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
APN
11024014
CURRENT_STATUS
01
SITE_LOCATION
4405 PACIFIC AVE
P_LOCATION
01
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
- <br /> 15 February 2002 <br /> AGE-NC Project No 96-0229 <br /> Page 10 of 12 <br /> combination of bailing with a two- or four-inch diameter stainless steel and/or PVC bailers to <br /> remove the mayor portion of fine-grained sediment from inside the well, surging to flush out or draw <br /> in sediment from the filter pack and additional ground water evacuation(purging)with a submersible <br /> pump to finish the removal of fine-grained sediment Developmental purging activities will be <br /> continued until field parameter (pH, electrical conductivity, and temperature) readings have <br /> stabilized and purged water is visually sediment-free Well development will occur no sooner than <br /> 72-hours following well completion <br /> 4 4 GROUND WATER AQUIFER PUMPING TEST <br /> A 24-hour ground water aquifer pumping test will be conducted at the site to induce a decline in <br /> static water level in the newly installed ground water extraction well (screened 25 to 45 feet bsg) <br /> Pressure transducers will be deployed, at a minimum, in wells EW-1, MW-1,MW-2,MW-3,MW-4 <br /> and MW-6 to measure the difference in ground water levels before well pumping versus time during <br /> ground water extraction A constant ground water pumping rate(approximately 5 gallons per minute) <br /> will be utilized from the ground water extraction well during the aquifer pump test to achieve <br /> optimum draw-down influence <br /> Grab water samples will be collected at 6-hour intervals an submitted to a DHS-certified Iaboratory <br /> for the following constituents <br /> • TPH-g in accordance with EPA Method 8015 Modified/5030, <br /> • BTEX compounds and MTBE in accordance with EPA Method 8020, <br /> • Fuel oxygenated compounds including MTBE, TAME, di-isopropyl ether (DIPE), ethyl <br /> tertiary-butyl ether(ETBE) and tertiary butanol (TBA)by EPA Method 8260 Modified, and <br /> • 1,2-Dichloroethane (1,2-DCA) and ethylene dibromide (EDB) by EPA method 8260 <br /> Modified <br /> • Total lead by EPA Method 7420 <br /> T 1-,._...�,.. ..�.. 1 t,,..,�. 4cc4r nr, mati-inric lai�nYatnn/ nliality n z niranrP/qualltV control <br /> LatJorator repoIt 1ki loll aila1y010, <br /> (QA/QC) reports, and sample chain of custody documentation will be presented in a report with <br /> findings and recommendations <br /> Purged ground water will be containerized in an on-site 10,000-gallon Baker tank, following the 24- <br /> hour pump test, a composite "grab" ground water sample will be collected from the Baker tank to <br /> analyze for TPH-g,BTEX,MTBE,TBA, TAME,DIPE,ETBE,EDB and 1,2-DCA by EPA Methods <br /> 8015M, 8020 and 8260M The purged ground water will be transported under non-hazardous waste <br /> Advanced GeoEnvironmcntal,Inc <br />
The URL can be used to link to this page
Your browser does not support the video tag.