My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0012612
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
PATTERSON PASS
>
25775
>
2900 - Site Mitigation Program
>
PR0543467
>
ARCHIVED REPORTS_XR0012612
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/4/2020 4:32:02 PM
Creation date
5/4/2020 4:19:25 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0012612
RECORD_ID
PR0543467
PE
2960
FACILITY_ID
FA0024672
FACILITY_NAME
FORMER ATLANTIC RICHFIELD CO (ARCO) NO 6100
STREET_NUMBER
25775
Direction
S
STREET_NAME
PATTERSON PASS
City
TRACY
Zip
95377
CURRENT_STATUS
01
SITE_LOCATION
25775 S PATTERSON PASS
P_LOCATION
03
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
198
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4. zix- <br /> ISM <br /> WRIMM <br /> INS <br /> F�I N111 <br /> INS <br /> Site Safety Plan <br /> ARCO Station No. 6100, Tracy, California --- <br /> Staff Geologist or Engineer is responsible for communicating Qhe information he andtocontained <br /> Fhe Sta S <br /> the <br /> in this Plan to the Applied GeoSystems perso;ino assigned lied GeoSystems on the <br /> responsible representative of each subcontractor working for App <br /> project. <br /> The-Staff Geologist or Engineer will also act as the Site Safely Officer. As such, the Staff <br /> Geologist or Engineer is responsible for addressing the following items: <br /> o Implementing the Site Safety Plan, Company policy, and procedures <br /> quate safety supplies and equipment inventory <br /> o Requiring and maintaining ade <br /> onsite <br /> o Conducting daily safety meetings and advising workers regarding hazards <br /> o Site control, decontamination, and contamination-reduction procedures <br /> o Reporting accidents or incidents <br /> work <br /> nY tme he or she <br /> nds <br /> The Staff Geologist or Engineer has t a��uuate tfor worker safety. aThei Staff GeoioFist or <br /> that the provisions of the Plan are in q <br /> Engineer will inform the Project <br /> Manager <br /> anlnd r and the <br /> Health nt actorsand S_ <br /> ywhose CoordinatorPromptly <br /> is no <br /> of deficiencies within th <br /> consistent with the requirements of this flan. <br /> MEDICAL SURVEILLANCE <br /> activities must <br /> Applied GeoSystems personnel and subcontractors engaged in project <br /> ning <br /> participate in a medical surveillanceprotection devices and proteand must ctive clothing foeared by r�workinglw th <br /> physician(s)to wear respiratory pro <br /> hazardous materials. The applicable requirements of Title 8,Section 5216.of the California <br /> Adm ins tive ode will be observed. The applicable requirements under 2'l CFR 1910.120 <br /> Athe Federal Adrnlnlstrative Code will also be observed. <br /> 2 <br /> }691-25 <br />
The URL can be used to link to this page
Your browser does not support the video tag.