Laserfiche WebLink
3 <br /> --_nn�r er��os�_+�_ _"�_~- I:nrir�irrun�,i1 SuLrtinns <br /> t g,sNA CWrrl,•m> IhrorrNh rlppfirri Sri"PUT, <br /> I71ginvvrirr9 R Cnn,lrorlion <br /> 316-I <br /> C" <br /> Gmll)l) ie',Stilt <br /> E Rolldlo COrd(wo,CA(1-0,70 <br /> Phont14161 gr,'-6691,1 <br /> SITE SAFETY Y PLAN No. 30041-25 <br /> SUBSURFACE ENVIRONMENTAL INVESTIGATION <br /> at the <br /> ARCO Service Station No. 6100 <br /> 25775 South Patterson Pass Road <br /> Tracy, California <br /> (August 2, 1991) <br /> INTRODUCTION the <br /> subsurface <br /> This Site Safety Pla!i describes bas, rthisiremePlan apply s for to theempees of Applied <br /> to environments <br /> investigation. The provisions set forth in <br /> visions, but only to upgrade or increase the safety <br /> GeoSystems and its subcontractors working on this phase of the project. The subcontractors <br /> may elect to mod fy these p lied GeoSystems, as designated and <br /> requirements, and only with the concurrence of App <br /> accepted in writing. be encountered <br /> This Site Safety Plan will address the expected potential hazards that may roust of <br /> on the worksite for this proje�:i. Feld activities steplanned orto begin workingconditions nding occur as <br /> Work Plan by San Joaquin County. If changes lied GeoSystems. <br /> activities progress, addenda to this plan will be provided by APP <br /> AtrMoR1TY FOR SITE SAFETY <br /> The Applied GeoSystems personnel responsible for project safety are the Project Manager <br /> choose to audit the <br /> and the Staff Geologist or Engineer. The <br /> and Safety P ogram and mayor is responsible or <br /> the overall Applied Geo5ysiems <br /> Nance and take appropriate action io correct deficiencies- <br /> site <br /> Project <br /> site for comp lamenting the provisions of this Plan, for providing a copy <br /> Manager is responsible for imp the Staff Geologist or <br /> of this Plan to the Staff safety <br /> Geologist or Engineer. <br /> �ectoManagergand Staff Geologist or <br /> Engineer on health and safety matters. <br /> ovisions of this <br /> She authority to audit site ac f or dismiss subcontractor or conipliancc Witt' the sr <br /> Engineer have Swhose conduct <br /> `-' Plan. They may suspend or modify work practices <br /> irements speci�ied in this Plan. <br /> does not meet the requ <br /> 30041-75 <br />