Laserfiche WebLink
StatusReport <br /> ARCO Facility No 6100 <br /> Tracy, California <br /> Page 2 <br /> • sample the onsite water supply well (modify wellhead for appropriate sampling if <br /> needed) on a quarterly basis, and <br /> • pursue offsite access to private property south of the site <br /> It was also concluded that Delta should reevaluate information gathered from previous <br /> investigations conducted at the site regarding the subsurface conditions (soil stratigraphy, <br /> distribution of hydrocarbons, etc ) to aid in developing an approach to further <br /> characterize the site Additionally, the locations of the water supply wells identified in <br /> the DWR well survey should be field verified <br /> The results or status of the additional activities performed in the first quarter 2001 are <br /> presented in the following sections A work plan outlining the proposed scope of work <br /> for further assessment is currently being prepared and will be submitted within the next <br /> 30 days In addition to characterizing the hydrogeology and the extent of liquid-phase <br /> hydrocarbons, the work plan will address onsite characterization of oxygenates recently <br /> identified in water samples collected from selected vapor extraction wells An access <br /> agreement has also been recently sent to the owner of the property located immediately <br /> south of the site <br /> • SITE BACKGROUND <br /> The site is currently an active ARCO service station located at the northwestern corner of <br /> the intersection of Patterson Pass Road and Interstate 580 near Tracy, California The <br /> facility configuration is shown on Figure 2 The site is approximately 300 feet above <br /> mean sea level (rnsl) with topography sloping towards the southeast The area <br /> surrounding the property is undeveloped land <br /> Originally one 550 gallon waste oil underground storage tank (UST), one 10,000-gallon <br /> gasoline UST and four 6,000-gallon USTs were present at the site The waste oil tank <br /> was removed in 1987 From November 1990 to February 1991, the five USTs and <br /> associated product delivery lines were removed and replaced with four 10,000-gallon <br /> USTs <br /> Soil investigations were conducted between 1991 and 1995 Concentrations of total <br /> petroleum hydrocarbons as gasoline (TPHG) and benzene, toluene, ethylbenzene, and <br /> total xylenes (BTEX) were detected in soil from 6 to 115 feet bgs, with the highest <br /> concentrations identified at approximately 26 to 45 feet below ground surface (bgs) A <br /> total of 31 soil borings, ranging in depth from 26 to 115 feet bgs, were drilled, 20 of the <br /> borings were completed as vapor extraction wells Groundwater was not encountered <br /> during any of the investigations <br />• A water supply well was installed onsite in 1969 in the southwestern corner of the <br /> property and currently supplies water to the service station The well was constructed of <br />