My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0011940
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
PATTERSON PASS
>
25775
>
2900 - Site Mitigation Program
>
PR0543467
>
ARCHIVED REPORTS_XR0011940
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/5/2020 9:42:15 AM
Creation date
5/5/2020 8:41:48 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0011940
RECORD_ID
PR0543467
PE
2960
FACILITY_ID
FA0024672
FACILITY_NAME
FORMER ATLANTIC RICHFIELD CO (ARCO) NO 6100
STREET_NUMBER
25775
Direction
S
STREET_NAME
PATTERSON PASS
City
TRACY
Zip
95377
CURRENT_STATUS
01
SITE_LOCATION
25775 S PATTERSON PASS
P_LOCATION
03
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
238
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TABLE 7 <br /> OPERATIONAL UPTIME AND FLOW RATE <br /> FOR SOIL VAPOR EXTRACTION SYSTEM <br /> Fortner ARCO Station No 6100 <br /> 25775 South Patterson Pass Road <br /> Tracy California <br /> System Inf Da-,s Between Sampling Hr Meter Flow Rate App VacDates Cumulattre Days Percent <br /> Date ` <br /> Readmg (acfm) ("WC) Total Datis Uptime Total Days Uptime U time <br /> Between March 9 2004 and November 2004,two 200 cfm King,Buck,&.Associates SVE system were operated at the <br /> site Operational data for these SVE s}stems are included in Appendix D System operated under PTO No N-5026-1- <br /> &N-5026-2-0 <br /> A Solleco 500 cfn SVE system was installed at the site to replace Icing,Buck&Associates SVE <br /> 5/16/2005 systems The start-up of Solleco 500 cfm SVE system was conducted in accordance with ATC No N- <br /> 5026-2-3 <br /> 5/16/2005 5,4163 191 89 1904 System Start-up,collect samples and shutdown awaiting <br /> compliance verification <br /> 5/20/2005 5,4228 4452 2312 System start-up for continuous operation after compliance <br /> verification <br /> 5/26/2005 5,575 0 417 2448 1 639 634 639 634 99% <br /> 5/31/2005 1 5,658 8 NM NM 1 465 349 1104 9 83 75% <br /> 6/1/2005 5,6591 System re-started after re-filling with propane <br /> 6/1/2005 5,6601 324 2312 1 05 005 1208 989 5% <br /> 6/7/2005 3,8040 335 231 2 601 600 1809 15 88 100% <br /> 6/14/2005 2 5 8794 2772 231 2 690 3 14 2499 1903 46% <br /> 6/17/2005 5 952 2 2352 231 2 325 303 2823 2206 1 93% <br /> 7/6/2005 6 404 9 338 680 1884 1886 4707 4092 100% <br /> 7/20/2005 6,741 6 269 680 1406 1403 61 13 5495 100% <br /> 7/26/2005 6 884 4 257 680 590 595 6703 6090 100% <br /> 8/2/2005 7,0536 23925 816 698 705 7401 6795 100% <br /> 8/16/2005 7,3915 252 81 6 1420 1408 8820 8203 99% <br /> 8/22/055 15 NM 255 408 -- -- — — — <br /> 8/22/05 8 00 7-533 7 247 952 593 592 94 13 8795 100% <br /> 8/26/2005 7,6308 242 1360 404 1 405 98 17 9200 100% <br /> 9/6/2005 7,8960 119 1 1224 1105 110 10923 10305 100% <br /> 9/19/2005 8,208 5 195 75 1 952 1278 1302 12201 11607 100% <br /> 9/19/2005 System shutdown due to otential bearing malfunction in the liquid ring blower <br /> 12/5/20053 8 209 2 19575 460 7711 003 199 12 116 10 -- <br /> 12/7/20054 8,213 8 2871 748 205 019 205 019 934% <br /> 12/8/2005 8 236 9 NM 748 1 03 096 200 15 11706 9333% <br /> 12/13/2005 8,355 9 2262 81 6 496 496 701 5 15 1 100% <br /> 12/21/2005 8,492 1 NM 680 8 15 568 20830 12274 70% <br /> 1/4/2006 8,825 5 316 884 1349 13 89 2050 1904 100% <br /> 1/24/200656 9,3048 NM NM 2000 1 1997 1 22830 14271 100% <br /> Arco_6I00_Quarterly_O&M_500cfm Page 1 of 5TRA7Uar <br />
The URL can be used to link to this page
Your browser does not support the video tag.