My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
PACIFIC
>
6230
>
2900 - Site Mitigation Program
>
PR0543479
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/5/2020 9:58:34 AM
Creation date
5/5/2020 9:11:45 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0543479
PE
2960
FACILITY_ID
FA0024679
FACILITY_NAME
CANEPA'S CAR WASH
STREET_NUMBER
6230
STREET_NAME
PACIFIC
STREET_TYPE
AVE
City
STOCKTON
Zip
95204
APN
081360030
CURRENT_STATUS
01
SITE_LOCATION
6230 PACIFIC AVE
P_LOCATION
01
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
613
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
h <br /> Cmepa's Car Wuh <br /> Augwf 20, 2001 <br /> Page -2- <br /> Estimated cost for carbon system purchase and installation: <br /> Cost for two 1000-pound carbon canisters: $6,440.00 <br /> Cost for delivery, installation, and permitting: $23000.00 <br /> Estimated capital cost: $83440.00 <br /> Estimated cost of operation (based on 85 days to breakthrough): <br /> Cost for turn4ey service by carbon company: $1 ,470.00 <br /> Cost per day for carbon: $ 1729 <br /> Estimated pay back for carbon purchase and installation: <br /> $87440.00 / ($92. 89 - $ 17.29) = 111 .6 days <br /> Based on the above analysis, if the system needs to operate for at least another 112 days, the <br /> carbon is less expensive. Furthermore, for each additional day of operation, the UST <br /> reimbursement fund will save approximately $75 . <br /> As a result of the above analysis, Condor proposes to discontinue the use of the thermal oxidizer <br /> and install carbon treatment. Upon approval by the PHS/EHD of this proposal and pre-approval <br /> of the costs by the UST Reimbursement Fund, Condor will prepare a modification application to <br /> the air discharge permit. Upon receipt of the modification approval, Condor will obtain and <br /> install the carbon units. If you have any questions, please call us at (209) 2340518. <br /> Sincerely, <br /> CONDO TH TECHNOLOGIES, INC. <br /> �� <br /> Jeff ille . <br /> Pr ject M ger <br /> cc. Mr. Remo Canepa, Canepa's Car Wash <br /> PA1707 C=cpa-PacfflclCaiespwd=wla-13-017-Waag.dw <br />
The URL can be used to link to this page
Your browser does not support the video tag.