Laserfiche WebLink
I <br /> I <br /> i <br /> I <br /> The system is designed to operate 24 hours a day 7 <br /> days per week with only monthly maintenance <br /> required Normal maintenance consists of oil changes <br /> I <br /> EXPECTED EMISSIONS OF AIR CONTAMINANTS <br /> The fuel hydrocarbons to be combusted at this site <br /> Iis gasoline . The average contaminant level- from the <br /> tests at the site was 3500 ppm total petroleum <br /> I hydrocarbons coming from the most contaminated <br /> extraction well . This equates to 2 .4 pounds of <br /> gasoline per hour coming from the wells . The effluent <br /> I from the engine exhaust measured 90 ppm of (TPH) . <br /> Using the maximum flow rate of 160 cfm the estimated <br /> pounds per day of uncombusted contaminants would be <br /> 3 .0 pounds every 24 hours . The Formula is based on <br /> 0 . 72 pounds of gasoline in each 1000 ppm �n the <br /> Iinfluent air stream, and 160 cfm of air flow <br /> OPERATING SCHEDULE <br /> The system is scheduled to operate 7 days a week 24 <br /> hours per day with one day per month as a scheduled <br /> maintenance day . . <br /> i PROCESS WEIGHT <br /> The type of material being combusted in the engine is <br /> gasoline . The anticipated rate of consumption at the <br /> maximum flow rate of 160 cfm is 30 pounds per day . <br /> i <br /> I <br />