Laserfiche WebLink
Canepa's Car Wash <br /> 6230 Pacific Avenue,Stockton,CA <br /> Fust Quarter Groundwater Monitoring Report,January 2006 <br /> Page 5 of 9 � <br /> Table 3—Groundwater Sample Laboratoaf Analytical Results (January 27,2006) <br /> Constituent Benzene Toluene Ethyl Total MTBE TPH-G <br /> Other Gasoline <br /> I Benzene Xylenes Oxygenates/Additives <br /> MGL I pg/L 150 pg/L 700 Ag/L 1,750µg/l_ 13 pg/L <br /> Analytical Method-+ 8260B 8260E 8260B 8260E 8260B 8015m 8260B <br /> Reporting Limits-+ 0 5 4g/L 0 5µg/l­ 0 5µg/1.. 10µg/L 0 5µF 0 O5 mg/L 0 5—20µg./1. <br /> Sample I D <br /> MW-1 7,760 4,540 676 3,1.51 6,650 23 2 3 4(EDB) <br /> MW-2 11,400 935 1,790 4,403 <1 0 363 <1 0-<40 0 <br /> MW-3 <1 0 <10 <1 0 <3 0 2,200 0 426 28.3 (1,2-DCA) <br /> MW-4 <05 <05 <05 <15 <05 <005 <05-<200 <br /> MW-9 <0 5 <0 5 <0 5 <1 5 <05 <0 05 <0 5-<20 0 <br /> MW-11 21 <05 30 32 <05 0156 <05-<'100 <br /> MW-12D <05 <05 <05 <15 <05 <005 <05- 100 <br /> SV-4 27,200 j 20,400 j 2,300 j 8,520 j 177,000 174 - <500-<20,000 <br /> Bold analytical data exceed California MCL(Maximum Contaminant Level), <br /> Units Analytical <br /> mg/L=milligrams per liter=parts per million(ppm) B,T,E,X=benzene,toluene,ethyl benzene,total xylenes <br /> pg/L=micrograms per liter=parts per billion(ppb) TPH-G=total petroleum hydrocarbons quantified as gasoline <br /> Gasoline oxygenates/additives= methyl tertiary-butyl ether(MTBE), ethanol, tertiary-butanol (TBA), di-isopropyl ether(DIPS), ethyl tertiary <br /> butyl ether(ETBE),tertiary-ainyl methyl ether(TAME),1,2-dichlorocthane(1,2-DCA), 1,2-dibromoethane(1,2-EDB) <br /> 10 <br /> TREATMENT SYSTEM STATUS UPDATE <br /> Installation of the pump and treat system and upgraded SVE system was completed In September 2004 <br /> The City of Stockton Municipal Utilities District (MUD) authorized the initiation of discharge of treated <br /> I groundwater on October 28, 2004 Groundwater extraction and treatment, with subsequent discharge to <br /> the sanitary sewer,began November 1, 2004 <br /> The system remained in normal operation during the months of November 2005 through January 2006 <br /> with periodic scheduled shutdowns by Condor technicians for system maintenance Several unscheduled, <br /> automatic shutdowns by the system's built-in safety features also occurred, generally related to blown <br /> fuses and high water levels in the storage tank Condor replaced the groundwater extraction pump in use <br /> in monitoring well MW-1 in late December 2005 <br /> MASS REMOVAL AND DESTRUCTION CALCULATIONS <br /> The system was operating for approximately 1,844 hours between October 31, 2005 and January 31, <br /> 2006, or approximately 84% of the tune The effects of the system auto-shutdowns and system <br /> I maintenance shutdowns referred to in the previous section are reflected in the mass removal and <br /> destruction calculations Operational and efficiency data are included in Attachment D <br /> Aqueous Phase Mass Remov al <br /> The groundwater treatment system has removed petroleum hydrocarbons from 476,152 gallons of <br /> groundwater during the first quarter of 2006 Groundwater treatment system samples and associated data <br /> were collected to comply with the Self-Monitoring Sample Program of the MUD Groundwater Discharge <br /> Permit, as well as to monitor the operational efficiency of the system and the consumption of carbon <br /> • (Attachment D) <br /> �,a CONDOR <br />