Laserfiche WebLink
v <br /> Exhibit A <br /> Canepa's Car Wash <br /> May 2, 1996 <br /> Page -2- <br /> D) All instrumentation currently available or necessary in the testing and operational phases for the <br /> SVE system. <br /> E) Radius of influence and pore volume exchange rates which may support these values. <br /> F) A schematic representation drawn to scale which clearly identifies current and proposed changes <br /> to the SVE system. <br /> A preliminary copy of the letter report will be presented to the client for review prior to finalization. At <br /> the approval of the client,copies of the final report will be submitted to the PHS/EHD and the CRWQCB. <br /> The report will be signed by a Registered Geologist or Professional Engineer responsible for the work. <br /> TASK 4 - QUARTERLY GROUNDWATER MONITORING AND REPORTING: <br /> The PHSIEHD will be notified at least 48 hours prior to each quarterly monitoring event. Condor <br /> will sample groundwater at the site on a quarterly basis for TPH-G, BTEX, and MTBE. The <br /> condition of each monitor well will be inspected during each groundwater monitoring event. <br /> Groundwater elevations will be measured for gradient calculations. Groundwater purged during <br /> the sampling will be stored on site in drums for disposal based on the results of the laboratory <br /> analyses. Disposal will be the responsibility of the property owner. <br /> Condor will prepare Quarterly GroundwaterMonitoring Reports that include groundwater chemistry <br /> data and groundwater gradient calculations. Fieldwork and reporting will follow PHS/EHD and <br /> CRWQCB guidelines and requirements. A preliminary copy of each report will be presented to <br /> the client for approval prior to finalization. The final report will be signed by a Registered <br /> Geologist or Professional Engineer responsible for the work. <br /> COST ESTIMATE <br /> Condor proposes a cost-reimbursement, time-and-materials contract for the performance of the scope of work <br /> described above. The total estimated cost for the SVE system evaluation(Tasks I through 3) is $1,398.00. <br /> The estimated cost for quarterly groundwater monitoring per quarter is $2,937.00. <br /> If necessary,acquisition of permits will be billed on a time and materials basis. Additional work or sample analyses <br /> will increase the overall cost of the project. Any work required beyond the scope of work described herein that <br /> results in additional costs will not be performed without prior authorization from Mr. Remo Canepa,Canepa's Car <br /> Wash. <br /> Canepa%Canepal.EXA <br /> `J CONDOR <br />