My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2020
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
F
>
FITE
>
4704
>
2800 - Aboveground Petroleum Storage Program
>
PR0527397
>
COMPLIANCE INFO_2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/10/2020 4:20:49 PM
Creation date
5/5/2020 10:23:59 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
FileName_PostFix
2020
RECORD_ID
PR0527397
PE
2832
FACILITY_ID
FA0014693
FACILITY_NAME
MARTIN-BROWER CO
STREET_NUMBER
4704
STREET_NAME
FITE
STREET_TYPE
CT
City
STOCKTON
Zip
95215
APN
18111013
CURRENT_STATUS
01
SITE_LOCATION
4704 FITE CT
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\dsedra
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
166
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
- <br /> Mf-714 TIF1-F3f_70LrjjET7 <br /> Ake�n xouuqG ryn <br /> CFR 112), or active secondary containment for the oil-filled equipment and OWS pump out <br /> operation. <br /> The 24-hour rainfall depth for the 25-year storm event at this location is 2.89 inches. <br /> (https://hdsc.nws.noaa.gov/hdsc/pfds/pfds_map_cont.html?bkmrk=ca). <br /> This value is deemed by the PE as a conservative capacity for a rain event. <br /> The areas that would function as either secondary (or tertiary) containment, or as active <br /> secondary containment measures (for possible releases from the transformers) is as <br /> follows: <br /> Oil Storage area Containment Area Net depth Net Containment <br /> (ft2) (inches or volume) Volume(gallons) <br /> Tank Farm Concrete berm 67'x21' = 6"-2.89" = 2,188 <br /> and pad 1407 ft2 3.11" <br /> Tank Farm Covered Storm 100'x100' = 9,444 ft3—2,408 ft3 = 52,700 <br /> Drain Collection 10,000 ft2 7,036 ft3 <br /> area, east <br /> (pyramidal) <br /> Tank Farm Covered Storm 80'x55' = 2,078 ft3-1,060 ft3= 7,625 <br /> Drain Collection 4,400 ft2 1,018 ft3 <br /> area, west <br /> (pyramidal) <br /> O/W Separator Covered Storm Est. 3,000 ft2 Dry weather 2062 <br /> pump out Drain, curb and curb height containment is 750 ft3 <br /> gutter area 6", 20 ft (5,600 gals) <br /> (south) wide, 150 Net with design storm <br /> lineal feet event': 206 gals <br /> available <br /> O/W Separator Covered Storm 80'x55' = 2,078 ft3-1,060 ft3 = 7,6252 <br /> pump out Drain Collection 4,400 ft2 1,018 ft3 <br /> area, west of fuel <br /> island (pyramidal) <br /> Transformer XF-1 Covered Storm Est. 3,000 ft2 Dry weather 206 <br /> Drain, curb and curb height containment is 750 ft3 <br /> gutter area (west) 6", 20 ft (5,600 gals) <br /> wide, 150 Net with design storm <br /> lineal feet event': 206 gals <br /> available <br /> Transformer XF-2 Covered Storm Est. 3,000 ft2 Dry weather 206 <br /> Drain, curb and curb height containment is 750 ft3 <br /> gutter area (east) 6", 20 ft (5,600 gals) <br /> wide, 150 Net with design storm <br /> lineal feet event': 206 gals <br /> available <br /> Secondary Containment Calculations Page 4 of 5 Appendix L <br />
The URL can be used to link to this page
Your browser does not support the video tag.