My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2020
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
F
>
FITE
>
4704
>
2800 - Aboveground Petroleum Storage Program
>
PR0527397
>
COMPLIANCE INFO_2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/10/2020 4:20:49 PM
Creation date
5/5/2020 10:23:59 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
FileName_PostFix
2020
RECORD_ID
PR0527397
PE
2832
FACILITY_ID
FA0014693
FACILITY_NAME
MARTIN-BROWER CO
STREET_NUMBER
4704
STREET_NAME
FITE
STREET_TYPE
CT
City
STOCKTON
Zip
95215
APN
18111013
CURRENT_STATUS
01
SITE_LOCATION
4704 FITE CT
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\dsedra
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
166
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
..lel <br /> x ism Mal]irq�fia�pmy <br /> Table 4 Potential Discharge Volumes and Direction of Flow <br /> Maximum Maximum <br /> Map Location and Possible Spill Probable Direction Secondary <br /> ID Potential Event Volume Discharge Rate2 of Flow Containment <br /> (gallons) <br /> Secondary containment within <br /> Gradual to double-walled steel tanks. <br /> Diesel Fuel Tank Farm Secondary containment around <br /> -Failure of AST <br /> instantaneous, tank fill port. <br /> se or breach likely volume <br /> (collapse 10,000 gal for tank Tank truck and M-B employees are <br /> 0011 below product level) 20,000* failure,to To storm drain system, present during all transfers and can <br /> -Tank overfill 10,000* secondary shell; catch basins east and west quickly stop flow. <br /> -Pipe failure for other modes, <br /> -Leaking pipe or 6 gpm to curb/ Active additional containment can <br /> valve packing berm area around be deployed using drain mats at <br /> tanks. storm water catch basins. <br /> 0021 <br /> 003 Vehicle Maintenance 650 Secondary containment within <br /> Shop double-walled steel tank. <br /> -Failure of AST Gradual to Additional active secondary <br /> (breach below product containment measures. <br /> 004 level) 500 instantaneous, To shop floor,then storm Secondary containment within <br /> -Tank overfill likely volume up drain system,catch basins double-walled steel tank. <br /> -Pipe failure to 650 gal for tank north and south Additional active secondary <br /> g pp or modes,6 gpm. <br /> -Leaking pipe failure;for other containment measures. <br /> 005 valve packing 55 Secondary containment by spill <br /> -Drum failure pallet. Additional active secondary <br /> containment measures. <br /> 12 MARTIN-BROWER <br />
The URL can be used to link to this page
Your browser does not support the video tag.