My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2020
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
F
>
FITE
>
4704
>
2800 - Aboveground Petroleum Storage Program
>
PR0527397
>
COMPLIANCE INFO_2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/10/2020 4:20:49 PM
Creation date
5/5/2020 10:23:59 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
FileName_PostFix
2020
RECORD_ID
PR0527397
PE
2832
FACILITY_ID
FA0014693
FACILITY_NAME
MARTIN-BROWER CO
STREET_NUMBER
4704
STREET_NAME
FITE
STREET_TYPE
CT
City
STOCKTON
Zip
95215
APN
18111013
CURRENT_STATUS
01
SITE_LOCATION
4704 FITE CT
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\dsedra
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
166
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
l l r77f4 X7'117-aRM"Er4 <br /> xizm WhL7irgs-Unpany <br /> Maximum Maximum <br /> Map Location and Possible Spill Probable Direction Secondary <br /> ID Potential Event Volume Discharge Rate2 of Flow Containment <br /> (gallons) <br /> XF-1 Transformers 240 6 gpm East to curb and gutter Active secondary containment <br /> Failure of Cooling Most likely<50 measures <br /> XF-2 System(puncture or 135 6 gpm East to curb and gutter Active secondary containment <br /> breach below product Most likely<50 measures <br /> XF-3 level) 135 6 gpm East to curb and gutter Active secondary containment <br /> Mishap during Most likely<50 measures <br /> maintenance <br /> 006 Diesel Gen-set, 1,026 Gradual to To storm drain system, Secondary containment within <br /> Outside west side of instantaneous, catch basins west double-walled steel tanks. <br /> warehouse- likely volume up <br /> Failure of AST(breach to 1,026 gal for Additional active secondary <br /> below product level) tank failure to containment measures. <br /> -Tank overfill secondary <br /> -Pipe failure <br /> -Leaking pipe or 159 gal/hr for pipe <br /> valve packing failure <br /> 007 Diesel Gen-set, 1,026 121 gal/hr for pipe To storm drain system, <br /> Outside east side failure catch basins east <br /> (south end) of <br /> warehouse Secondary containment within <br /> -Failure of AST double-walled steel tanks. <br /> (breach below product <br /> level) Additional active secondary <br /> -Tank overfill containment measures <br /> -Pipe failure <br /> -Leaking pipe or <br /> valve packing <br /> 13 MARTIN-BROWER <br />
The URL can be used to link to this page
Your browser does not support the video tag.