My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
PACIFIC
>
1665
>
3500 - Local Oversight Program
>
PR0545638
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/5/2020 11:44:53 AM
Creation date
5/5/2020 10:57:07 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0545638
PE
3528
FACILITY_ID
FA0005998
FACILITY_NAME
UNION OIL SS#2859
STREET_NUMBER
1665
STREET_NAME
PACIFIC
STREET_TYPE
AVE
City
STOCKTON
Zip
95204
APN
13702031
CURRENT_STATUS
02
SITE_LOCATION
1665 PACIFIC AVE
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
656
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
k <br /> U ..� <br /> San Joaquin County DIRECTOR <br /> PQu rN Donna Heran,RENS <br /> ,o. o Environmental Health Department <br /> ASSISTANT DIRECTOR <br /> ?' '' ��~ , 600 East Main Street Laurie Cotulla,REHS <br /> "r °f Stockton, California 95202-3029 PROGRAM COORDINATORS <br /> ;f r <br /> Carl Borgrnan,REHS <br /> Website: www.sjgo <br /> 4�rMike Huggins, REHS,RDI <br /> �a Wev.org/ehd gg�oR Phone: 209 Margaret Lagorio,REHS <br /> ( 468-3420 Robert McClellon,REHS <br /> Fax: (209)464-0138 Jeff Carruesco, REHS, RDI <br /> Stephanie Furgal Kasey Foley,REHS <br /> Chevron Environmental Management Company <br /> 6111 Bollinger Canyon Road, Room 3652 <br /> San Ramon, CA 94583 <br /> i <br /> Subject: 1665 Pacific Avenue <br /> Stockton, CA <br /> Work Plan: Work Plan Addendum Dated: November 19, 2008 <br /> Prepared By: ARCADIS <br /> APPROVED X <br /> DISAPPROVED ❑ <br /> ADDENDUM ❑ Submit by <br /> Adequate and Necessary Elements of the Work Plan [Health & Safety Code (H&S) Section <br /> 25296.10(c)(3)1: <br /> 1. Installation of a three soil borings to 65 feet below grade, installation of seven shallow/deep <br /> vapor probes and discrete interval groundwater sampling of MW2. <br /> 2. Collection of soil, vapor and water samples for laboratory analysis. <br /> 3. Laboratory analysis of soil, vapor and water samples for total petroleum hydrocarbons <br /> (TPH) as gasoline, BTEX, MTBE and other gasoline additives using appropriate EPA <br /> methods. <br /> 4. Preparation of a report on the work. <br /> Comments and Conditions: <br /> 1. Submit an Environmental Health Department (EHD) well permit application and $89 <br /> permit fee for each C-57 licensed driller that will be working at the site. Once the well <br /> permit has been approved, notify EHD of the proposed schedule for the work. <br /> 2. The work should be completed within 60 days of the date of this letter and the report <br /> should be submitted to the EHD within 60 days of completion of the work. <br /> Dated [a If 16-,3 By :J� Ak:�t� <br /> Cc: Jim Barton, CVRWQCB <br /> Bank of Stockton, Helen McCrary Trust, P.O.Sox 201014, Stockton, CA 95201 <br /> David Evans, ARCADIS, 950 Glenn Drive Ste 125, Folsom, CA, 95630 <br />
The URL can be used to link to this page
Your browser does not support the video tag.