Laserfiche WebLink
August 6, 1993 . <br /> Page 6 <br /> REFERENCES: <br /> Resna,Letter Report Groundwater Monitoring, First Quarter 1993, April 20, 1993 <br /> Resna, Vapor-Extraction Test Results, January 4, 1993 <br /> Applied Geosystems, Report Subsurface Environmental Investigation, December 12, <br /> 1990 <br /> PHR Environmental Consultants, Inc., Phase I Environmental Site Assessment, <br /> July 15, 1992 <br /> Attachments. Figure 1 - Site Location Map <br /> Figure 2 - Site Map <br /> Figure 3 - Geologic Cross-Section A-A' <br /> Figure 4 - Proposed Monitoring Well Location Map <br /> Attachment A- Summary Data from Resna's Report titled <br /> Groundwater Monitoring Report, <br /> First Quarter 1993 <br /> Attachment B - Isoconcentration Contour Maps - <br /> August 1989 through May 1993 <br /> Attachment C- Field and Laboratory Procedures <br /> i <br /> 3104001\WORKPLN <br />