My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0012345
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
PACIFIC
>
1665
>
3500 - Local Oversight Program
>
PR0545638
>
ARCHIVED REPORTS_XR0012345
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/5/2020 1:15:00 PM
Creation date
5/5/2020 12:11:38 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0012345
RECORD_ID
PR0545638
PE
3528
FACILITY_ID
FA0005998
FACILITY_NAME
UNION OIL SS#2859
STREET_NUMBER
1665
STREET_NAME
PACIFIC
STREET_TYPE
AVE
City
STOCKTON
Zip
95204
APN
13702031
CURRENT_STATUS
02
SITE_LOCATION
1665 PACIFIC AVE
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
April I4, 1995 <br /> Page 5 <br /> • will be recorded, and system influent and effluent samples will be collected Information <br /> generated during start-up will be presented to the District 4s necessary to complete <br /> source testing and obtain a Permit to Operate <br /> Remedial Progress Monitoring <br /> The following parameters will be collected initially and monitored during the 6-month <br /> SVE test <br /> • Influent TPH-g in soil vapor will be monitored on a semimonthly basis <br /> • Total volatile hydrocarbons will be monitored at each well on a senu- <br /> monthly basis <br /> • Vacuum pressure and flow rates will be monitored semimonthly <br /> • Dissolved TPH-g and benzene, toluene, ethylbenzene, and xylenes in <br /> groundwater will be analyzed initially, and at 3-month intervals <br /> • Dissolved oxygen will be analyzed at each vadose and monitoring well <br /> on a monthly basis in order to monitor oxygen available for biodegra- <br /> dation <br /> • Carbon dioxide and oxygen concentrations in soil vapor will be <br /> • analyzed on a monthly basis in order to monitor aerobic biodegrada- <br /> tion at the site <br /> Technical Report <br /> After receipt of all field data and Iaboratory data, the information collected during this <br /> 6-month SVE study will be evaluated and assembled into a technical report The report <br /> will include the TPH-g mass removed during the study, mass removal rate trends, hydro- <br /> carbon biodegradation rates, and recommendations regarding the long term feasibility <br /> SVE in conjunction with bioremediation at the site <br /> SCHEDULE <br /> A schedule for implementation of the Proposed scope of work follows The dates given <br /> are estimated completion dates and are contingent upon timely receipt of work plan <br /> approval <br /> • PHS/EHD review and work plan approval 04/30/95 <br /> • SVE System Design 05/31/95 <br /> • Prefield Activities (air and building permits, bids, etc ) 07/31/95 <br /> • • SVE System Construction 08/31/95 <br /> 3100403A\WORKPLAN <br />
The URL can be used to link to this page
Your browser does not support the video tag.