Laserfiche WebLink
V <br /> Our client for this project is a priority C with the tank fund, which means they will not <br /> be reimbursed for a minimum of 7-8 months, but perhaps even as long as a year. Even <br /> priority B's are currently running on 7-8 month turnaround with the tank fund. As a <br /> result, I have been instructed to try and keep cost down to the minimum. <br /> Thanks - Tim <br /> Timothy J. Cuellar <br /> Senior Project Geologist <br /> Advanced GeoEnvironmental, Inc. <br /> Stockton . Santa Rosa . Monterey . . Brea . Spokane . Reno . Dallas 1-800-511-9300 <br /> tcuellar@advgeoenv.com www.advgeoenv.com <br /> This email/fax message is for the sole use of the intended recipient (s) and may contain <br /> confidential and privileged information. Any unauthorized review, use, disclosure or <br /> distribution of this email/fax is prohibited. If you are not the intended recipient, <br /> please contact the sender by email/fax and destroy all, paper and electronic copies of the <br /> original message. <br /> --Original Message----- <br /> From: Adrienne Ellsaesser [EH] [mailto:AEllsaesser@sjcehd.com] <br /> Sent: Wednesday, October 31, 2012 10:05 AM <br /> To: tcuellar@advgeoenv.com <br /> Subject: RE: Cryogenic drilling <br /> Tim, <br /> I see that the 2402 Pacific CMT well is at one of your sites. You are proposing to over <br /> drill the well. Can get your driller to use the liquid/gas nitroqen to see if this works? <br /> Adrienne <br /> -----Original Message----- <br /> From: Adrienne Ellsaesser [EH] <br /> Sent: Tuesday, October 30, 2012 1:33 PM <br /> To: 'tcuellar@advgeoenv.com' <br /> Subject: RE: Cryogenic drilling <br /> Thanks Tim for sending it on to a driller. I scanned the internet to see if one was out <br /> there but came up empty. I was thinking that grouting before drilling the CMT may not be <br /> needed with this method, so that cost would not be incurred. <br /> I did not know about the CMT destruction. Thanks for the heads up. <br /> Adrienne <br /> -----Original Message----- <br /> . From: Tim Cuellar [mailto:tcuellax@advgeoenv.com] <br /> Sent: Tuesday, October 30, 2012 12:16 PM <br /> To: Adrienne Ellsaesser [EH] <br /> Subject: RE: Cryogenic drilling <br /> Yikes. . . . ..looks expensive. I'll give RSI drilling (Derek Sandberg) a call and have him <br /> take a look at the document and give me some feedback. <br /> Also, not sure if your aware but Daniel Villanueva in my office has tentatively scheduled <br /> with Johnny the destruction of a CMT well at 2402 Pacific Avenue, Stockton for Nov. 19th. <br /> Thanks - Tim <br /> Timothy J. Cuellar <br /> Senior Project Geologist <br /> Advanced GeoEnvironmental, Inc. <br /> Stockton . Santa Rosa . Monterey . Brea . Spokane . Reno . Dallas 1-800-511-9300 <br /> tcuellar@advgeoenv.com www.advgeoenv.com <br /> 2 <br />