Laserfiche WebLink
5.0 PROJECT SCHEDULE <br /> California Fuels has been tentatiN ely- accepted into the State of California Cleanup <br /> Fund Because of the anticipated depth to groundwater (65+ feet), and the fact that <br /> there is no c-,idcnce of tank leakage from in%cntory control or tank tests, California <br /> Fuels would like to begin this work when it receives relief by the fund <br /> All work acts%ttics, including preparation of a technical report, arc scheduled for <br /> completion within 90 da}s of state cleanup fund relief A detailed project time <br /> schedule is presented in Table 5-1 The schedule assumes authorization to proceed as <br /> da} 1, and pros ides for submission of a technical report to San Joaquin Public Health <br /> Scr%ices on day 90 <br /> Table 5-1. Proposed Schedule to Complete a Preliminary Site <br /> Assessment of California Fuel's Cardlock Station Located at 2402 <br /> Pacific ANenue in Stockton CA. <br /> 7 ask Start Date Finish Date <br /> Execute Subcontracts, Organize Field 1 30 days <br /> Program, Schedule Staff, Obtain 1'k'cll <br /> Permits <br /> Install Soil Borings and Monitoring 30 45 days <br /> Wells Dc�clop, purge, and sample <br /> wells Monitor groundAater lc,,cls <br /> and floating phase liquid <br /> hydrocarbon thickness <br /> Chemically Analy zc Soil and <br /> Ground%%atcr Samples 45 60 days <br /> Data Anal sis and Draft s Report 60 75 da <br /> )s <br /> y <br /> Finalize and Submit Technical Report 75 90 days <br /> to San Joaquin Public Health <br /> Department <br /> 1 <br /> 16 <br />