My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0005444
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
PACIFIC
>
2402
>
3500 - Local Oversight Program
>
PR0545640
>
ARCHIVED REPORTS_XR0005444
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/5/2020 2:14:35 PM
Creation date
5/5/2020 1:40:20 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0005444
RECORD_ID
PR0545640
PE
3528
FACILITY_ID
FA0003900
FACILITY_NAME
PACIFIC PRIDE COMMERCIAL FUEL
STREET_NUMBER
2402
STREET_NAME
PACIFIC
STREET_TYPE
AVE
City
STOCKTON
Zip
95204
APN
12506001
CURRENT_STATUS
02
SITE_LOCATION
2402 PACIFIC AVE
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• 05 August 1998 <br /> AC"TL-NG Project No 95-0173 <br /> Page 2 of 3 <br /> • The approximate cost for Installation of a thermal oxidizer-based SVE system Including the <br /> Installation of five additional SVE wells will be $20,000 00 to $30,000 00 The estimated <br /> cost for operation, maintenance and monitoring (Including unit rental) will be $40,000 to <br /> $55,000 per year Periodic costs,such as non-routine maintenance and supplemental fuel, can <br /> range from $10,000 to $20,000 annually <br /> IN-SITUAIR SPARGING <br /> Based upon data collected at the site during a 72-hour IAS pilot test performed between 13 and 15 <br /> January 1998, AGE concludes <br /> • A theoretical radius of influence between 15 and 20 fee�for ground water air sparging <br /> Utilizing existing IAS wells AW-1 and AW-2 and existing ground water monitoring wells <br /> MW-1, MW-2 and MW-3 for air infection, we recommend the Installation of five additional <br /> IAS wells to effectively remediate ground water at the site Proposed and existing IAS well <br /> locations with respected theoretical radii of influence are illustrated in Figure 11 <br /> • Air sparging within moderately permeable aquifers generally results in a moderate reduction <br /> of volatile hydrocarbon concentrations in the saturated zone Remediation durations are <br /> generally comparable with SVE Therefore, we anticipate a 18 to 24 month remediation <br /> period will result in a 90 percent reduction in dissolved shorter-chain hydrocarbons IAS will <br /> not be as effective in reducing concentrations of longer-chain hydrocarbons <br /> • Installation of an IAS system will require a piping system and additional equipment <br /> Installation and setup costs are estimated to be $20,000 to $30,000 Maintenance and <br /> monitoring costs will be $10,000 to $20,000 annually Periodic costs, such as non-routine <br /> maintenance and supplemental fuel, can range from $5,000 to $10,000 annually <br /> • <br /> Advanced GeoEnvironznental, Inc <br />
The URL can be used to link to this page
Your browser does not support the video tag.