My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_FILE 7
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
S
>
SIXTH
>
720
>
2900 - Site Mitigation Program
>
PR0009049
>
COMPLIANCE INFO_FILE 7
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/5/2020 2:49:30 PM
Creation date
5/5/2020 2:05:47 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
COMPLIANCE INFO
FileName_PostFix
FILE 7
RECORD_ID
PR0009049
PE
2960
FACILITY_ID
FA0004041
FACILITY_NAME
UP TRACY RAIL YARD
STREET_NUMBER
720
Direction
E
STREET_NAME
SIXTH
STREET_TYPE
ST
City
TRACY
Zip
95376
APN
25001014
CURRENT_STATUS
01
SITE_LOCATION
720 E SIXTH ST
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
171
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 2 <br /> KEY PERSONNEL <br /> The organization and responsibilities for implementing safe project <br /> activities, and more specifically the requirements contained in this HSP, <br /> are discussed in this section. <br /> The key personnel for this project are: <br /> • Project Manager: Mike Quillin, R.G. <br /> • Project Geologist: John Cavanaugh, R.G. <br /> • Project Engineer: Arun Chemburkar, P.E. <br /> • Site Health and Safety Officer/Foreman: Carl Taylor <br /> • Director, Internal Health and Safety: Steven Meyers, CIH <br /> Project Manager <br /> The ERM Project Manager (PM) is, by designation, the individual who has <br /> the primary responsibility for ensuring the overall health and safety of <br /> this project. The PM, therefore, has the primary responsibility for <br /> ensuring the implementation of the requirements of this HSP. The PM's <br /> specific responsibilities include: <br /> • Ensuring that all project personnel have received a copy of and have <br /> read this HSP and have completed the HSP signature sheet; <br /> • Requiring the attendance of all site personnel to a tailgate briefing <br /> apprising them of the contents of this HSP and specific hazards <br /> identified to be present at the facility prior to performing work; <br /> • Ensuring that sufficient personal protective equipment (PPE), as <br /> required by this HSP, is available during the project; <br /> • Obtaining all subcontractor documentation of employee participation <br /> in a medical monitoring and training program; <br /> 2-1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.