My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_FILE 7
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
S
>
SIXTH
>
720
>
2900 - Site Mitigation Program
>
PR0009049
>
COMPLIANCE INFO_FILE 7
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/5/2020 2:49:30 PM
Creation date
5/5/2020 2:05:47 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
COMPLIANCE INFO
FileName_PostFix
FILE 7
RECORD_ID
PR0009049
PE
2960
FACILITY_ID
FA0004041
FACILITY_NAME
UP TRACY RAIL YARD
STREET_NUMBER
720
Direction
E
STREET_NAME
SIXTH
STREET_TYPE
ST
City
TRACY
Zip
95376
APN
25001014
CURRENT_STATUS
01
SITE_LOCATION
720 E SIXTH ST
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
171
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Remediation Objectives <br /> Four remediation objectives have been developed for remediation at the <br /> site. These are: <br /> • Extracted Ground Water Treatment Objective. This objective is <br /> developed for treatment of ground water extracted at dual phase <br /> extraction wells and plume margin wells. Ground water treatment <br /> will be in accordance with WDRs specified by RWQCB Order No. <br /> 92-226 and CAO No. 92-707. Extracted ground water will be <br /> treated by air stripping and carbon adsorption processes to remove <br /> VOCs in ground water to below maximum contaminant levels <br /> (MCLS) prior to ground water reinjection. <br /> • Extracted Soil Vapor Treatment Objective. Soil vapor extracted at <br /> dual phase extraction wells and soil vapor extraction wells will be <br /> treated by catalytic oxidation to destroy VOCs in the soil vapor. <br /> Soil vapor will be treated to applicable air quality standards, and <br /> discharged to the atmosphere. <br /> • Remediation of Vadose Zone Soil at the Site. During remediation <br /> at the site, extracted soil vapor will be monitored for VOC <br /> concentrations. Soil vapor extraction will continue until the <br /> practical limitation of the technology is reached. <br /> • A-Zone Ground Water Plume Control. Ground water monitoring <br /> will be conducted during remediation at the site to document <br /> successful control of the VOC ground water plume and the <br /> removal of the soil vapor and floating product sources of impacts <br /> to A-zone ground water quality. <br /> Each of these treatment objectives is discussed below. <br /> Treatment Objectives <br /> Extracted ground water and soil vapor treatment objectives are discussed <br /> below. <br /> 4-8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.