' 20 December 2001 <br /> • AGE-NC Project No 95-0128 <br />' Page 2 of 9 <br /> I2 1 INSTALLATION OF GROLND WATER EXTRACTION PUMP <br /> On 01 August 2001, AGE installed a 4-inch diameter, stainless steel model 5E Grundfos Rediflow <br /> down-well pump equipped with 230 volt Franklin 1/3-horsepower motor in ground water extraction <br /> well EW-1 The Grundfos pump was externally equipped with a one-way check valve to prevent <br /> back-flow The Grundfos pump was installed in extraction well EW-1 at a depth of approximately <br />' 42 feet below surface grade(bsg) Schedule 80, 1-inch diameter poly vinyl chloride(PVC)piping was <br /> routed from the pump to the top of the well casing and through a 6-inch diameter sanitary well seal <br />' At surface grade, a PVC valve and flow meter were installed at the outlet of the well head to control <br /> and monitor the extraction flow rate A generalized diagram of the pump and well design is presented <br /> in Figure 5 <br /> I2 2 INSTALLATION OF GROUND WATER PUMP AND TREAT SYSTEM <br /> AGE installed an on-site ground water pump and treat system, ground water pump and treat <br /> installation procedures For the site were outlined inMonitoring Welllnstallation and Interim Ground <br /> Water Remediation <br />' Between 15 July and 01 October 2001, a ground water pump and treat system was installed at the <br /> site The remediation system was Installed inside a gated enclosure.Two 1,000-pound media vessels, <br /> one 300-gallon poly tank (holding tank), one process pump and one sediment filter chamber were <br />' installed for the ground water pump and treat system The influent piping was routed to a 300-gallon <br /> poly tank (holding tank) at the east-section of the gated enclosure The holding tank was equipped <br /> with various water level float switches to govern the rate at which extracted water was introduced <br />' into the treatment vessels, to allow coarser sediment to settle out prior to treatment and to provide <br /> safety shutoff capabilities A high float (high-high) was installed near the top of the holding tank <br /> designed to shut the entire treatment system down ifwater level exceeds the high-high float A middle <br />' float was installed near the middle of the holding tank to turn on the process pump A low float was <br /> installed near the bottom of the holding tank (low-low) to turn off the process pump A PVC <br /> sampling port was installed downstream of the holding tank for sampling <br /> A 113-horsepower, 120-volt,single-phase sump/process pump was Installed within the holding tank <br />' The process pump Is designed to process ground water through the treatment system at a maximum <br /> flow rate of 5 gallons per minute (GPM) From the process pump, 1-inch diameter PVC piping <br /> (schedule 40) was routed to a 3-gallon suspended solids filter chamber equipped with 25-micron <br /> replaceable blown-fabric sediment filter bags <br /> From the filter chamber, schedule 40 PVC piping was routed to two 1,000-pound vessels containing <br /> granular activated carbon (GAC - liquid phase filtration media) The two GAC media vessels are <br /> Advanced CeoEnvironmental Inc <br />