My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0008154
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
PACIFIC
>
4511
>
3500 - Local Oversight Program
>
PR0545641
>
ARCHIVED REPORTS_XR0008154
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/5/2020 3:04:31 PM
Creation date
5/5/2020 2:39:28 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0008154
RECORD_ID
PR0545641
PE
3528
FACILITY_ID
FA0002480
FACILITY_NAME
SHOP N GO 3
STREET_NUMBER
4511
STREET_NAME
PACIFIC
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
APN
11023011
CURRENT_STATUS
02
SITE_LOCATION
4511 PACIFIC AVE
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
30 September 1996 <br /> AGE-NC Project No 95-0128 <br /> Page 4 of 5 <br /> 12 Cuttings will be stored in properly labeled D O T model 17H 55-gallon drums on-site <br /> pending laboratory analysis and disposal <br /> 13 Rinseate generated during drilling activities will be containenzed in properly labeled D O T <br /> model 17H 55-gallon drums,and stored on-site in an area inaccessible to the general public <br /> 14 Develop new monitoring wells utilizing a submersible pump until water is essentially <br /> sediment free <br /> 15 Survey the top of each well casing to the nearest l/100th of a foot to determine the elevation <br /> relative to a single well <br /> 3 2 GROUND WATER SAMPLING <br /> Upon completion of installation procedures, ground water samples will be collected from each new <br /> well <br /> • 1 No sooner than 48 hours after installation of ground water monitoring wells, measure to the <br /> nearest 0 01 foot, the static water Ievel in the new wells <br /> 2 Using a dedicated bailer or submersible pump, surge and purge all wells At least three well <br /> volumes of water will be removed from each well to stabilize temperature, pH, and <br /> conductivity, stabilization parameters will be measured at one-well volume intervals <br /> 3 Ground water samples will be collected using polyethylene disposable bailers, samples will <br /> be collected in l-liter amber bottles and 40-m1 VOA vials preserved with hydrochloric acid <br /> 4 Label and log water samples on a chain-of-custody form <br /> 5 Store the samples in a chilled container and transport under chain-of-custody procedure to <br /> a state-certified laboratory for analysis Water samples will be analyzed for TPH-g, TPH-d <br /> BTE&X and MTBE, in accordance with EPA methods 5030/8015m, 5030/8015m, 8020/602 <br /> and 8020/602, respectively <br /> 6 Store purged water in properly labeled D O T model 17H 55-gallon drums on-site in an area <br /> inaccessible to the general public, pending analytical results <br /> 33 REPORTING <br /> • A report detailing the results of the investigation will be prepared The report will be in a format <br /> acceptable to the PHS-EHD and CVRWQCB If appropriate, the report will be a revised Corrective <br />
The URL can be used to link to this page
Your browser does not support the video tag.