My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0008168
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
PACIFIC
>
4511
>
3500 - Local Oversight Program
>
PR0545641
>
ARCHIVED REPORTS_XR0008168
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/5/2020 3:36:03 PM
Creation date
5/5/2020 2:43:54 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0008168
RECORD_ID
PR0545641
PE
3528
FACILITY_ID
FA0002480
FACILITY_NAME
SHOP N GO 3
STREET_NUMBER
4511
STREET_NAME
PACIFIC
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
APN
11023011
CURRENT_STATUS
02
SITE_LOCATION
4511 PACIFIC AVE
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
49
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
03 July 1997 <br /> AGE-NC Project No 95-0130 <br /> Page 2 of 2 <br /> approximately $40,000 to $55,000 per year <br /> • Periodic costs, such as non-routine maintenance and supplemental fuel (natural gas or <br /> propane), will range from $10,000 to $20,000 annually <br /> IN-SITUAIR SPARGING <br /> • Air sparging within moderately permeable aquifers generally results in a moderate reduction <br /> of volatile hydrocarbon concentrations in the saturated zone Remediation durations are <br /> generally comparable with SVE Therefore, we anticipate a 12 to 24 month remediation <br /> period will result in an 75 to 90 percent reduction in dissolved shorter-chain hydrocarbons <br /> IAS will not be as effective in reducing concentrations of longer-chain hydrocarbons <br /> • Installation of an IAS system will require numerous sparging points, a piping system and <br /> equipment Installation and setup costs are estimated to be $25,000 to $30,000 <br /> + Maintenance and monitoring costs will range from $10,000 to $20,000 annually <br /> Periodic costs, such as non-routine maintenance and supplemental fuel (electricity), can range <br /> from $5,000 to $10,000 annually <br /> I Upon approval of the RAWP, a detailed cost estimate will be provided to the Top Filling Station for <br /> the entire scope of work The opportunity to provide this service is greatly appreciated If you have <br /> any questions or comments, please contact our office at (209) 956-0264 <br /> Sincerely, <br /> Advanced GeoEnvironmental, Inc <br /> Timothy J Cu ar Sob Marty <br /> Staff Geologist Project Geologist/Direct6 e Operations <br /> Enclosures <br /> cc 2 addressee <br />
The URL can be used to link to this page
Your browser does not support the video tag.