Laserfiche WebLink
Page 8,CAY ARCO mim meirt <br /> A minimum of two soil bonngs will be drilled annually to collect soil samples for laboratory <br /> analysts The timing, location, and depth of these bonngs will be determined in consultation <br /> with EHD, but it is estimated that a tdtal of 80 feet of drilling will occur annually One or more <br /> of these bonngs may be completed as additional extraction wells, if warranted <br />' 6.0 SC D <br /> HE ULE <br />' Following acceptance of the CAP, Mr Wyatt will solicit a minimum of three bids for <br /> installation, operation, and maintenance of the vapor extraction system Quarterly groundwater <br /> momtonng may also be included in the Request for Proposals A tentative deadline of <br /> November 15 will be set for receipt of bids <br />' It is anticipated that the system could be installed during December 1994 and begin operation in <br /> January, 1995 The first quarterly report would then be due in April The duration of the <br /> Iremediation cannot be reliable estimated at this time, but the system can be expected to operate <br /> for a period of 1 to 2 years <br /> 1 <br /> 1 - + <br /> I <br />