My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0008172
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
PACIFIC
>
4511
>
3500 - Local Oversight Program
>
PR0545641
>
ARCHIVED REPORTS_XR0008172
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/5/2020 3:33:20 PM
Creation date
5/5/2020 2:45:07 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0008172
RECORD_ID
PR0545641
PE
3528
FACILITY_ID
FA0002480
FACILITY_NAME
SHOP N GO 3
STREET_NUMBER
4511
STREET_NAME
PACIFIC
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
APN
11023011
CURRENT_STATUS
02
SITE_LOCATION
4511 PACIFIC AVE
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 8,CAY ARCO mim meirt <br /> A minimum of two soil bonngs will be drilled annually to collect soil samples for laboratory <br /> analysts The timing, location, and depth of these bonngs will be determined in consultation <br /> with EHD, but it is estimated that a tdtal of 80 feet of drilling will occur annually One or more <br /> of these bonngs may be completed as additional extraction wells, if warranted <br />' 6.0 SC D <br /> HE ULE <br />' Following acceptance of the CAP, Mr Wyatt will solicit a minimum of three bids for <br /> installation, operation, and maintenance of the vapor extraction system Quarterly groundwater <br /> momtonng may also be included in the Request for Proposals A tentative deadline of <br /> November 15 will be set for receipt of bids <br />' It is anticipated that the system could be installed during December 1994 and begin operation in <br /> January, 1995 The first quarterly report would then be due in April The duration of the <br /> Iremediation cannot be reliable estimated at this time, but the system can be expected to operate <br /> for a period of 1 to 2 years <br /> 1 <br /> 1 - + <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.