My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2013 - 2018
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
Y
>
YOSEMITE
>
1711
>
2300 - Underground Storage Tank Program
>
PR0231455
>
COMPLIANCE INFO_2013 - 2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/6/2020 1:54:57 PM
Creation date
5/5/2020 4:53:14 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2013 - 2018
RECORD_ID
PR0231455
PE
2361
FACILITY_ID
FA0003612
FACILITY_NAME
Yosemite Avenue Arco AmPm
STREET_NUMBER
1711
Direction
E
STREET_NAME
YOSEMITE
STREET_TYPE
Ave
City
Manteca
Zip
95336
CURRENT_STATUS
01
SITE_LOCATION
1711 E Yosemite Ave
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
459
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB,January 2002 Page of <br /> 5. SECONDARY PIPE TESTING <br /> Test Method Developed By: X Piping Manufacturer Industry Standard Professional Engineer <br /> ❑Other(Spec) <br /> Test Method Used: X Pressure C.Vacuum Hydrostatic <br /> ❑Other(Spec) <br /> Test Equipment Used: Pressure Gauges in Psi/Nitrogen Equipment esolution: 1/10-15 Psi <br /> Piping Run#1 Piping Run#2 Piping Run# Piping Run# <br /> Piping Material: Fiberglass Fiberglass <br /> Piping Manufacturer: Smith Smith <br /> Piping Diameter: 3" 3" <br /> Length of Piping Run: Approx. 180' Approx. 160' <br /> Product Stored: Regular 87/Regular 87 Super 91 <br /> Test Port at Test Port at <br /> Method and location of UDC#3&4&Test UDC#3&4&Test <br /> piping-run isolation: boots at STP Piping boot at STP Piping <br /> Sumps#1&2 Sump#3 <br /> Wait time between applying 10 Minutes 10 Minutes <br /> pressure and starting test: <br /> Test Start Time: 12:30 12:40 <br /> Initial Reading(R[): 5 Psi 5 Psi <br /> Test End Time: 1:30 1:40 <br /> Final Reading(RF): 5 Psi 5 Psi <br /> Test Duration: 1 Hour 1 Hour <br /> Change in Reading(RF-Ri): 0 Psi 0 Psi <br /> Pass/Fail Threshold or No Loss in Psi No Loss in Psi <br /> Criteria: <br /> Test Result: Pass Pass <br /> Comments—(include information on repairs made prior to testing, and recommended folloi,-:ip for failed tests) <br /> Secondary Pipe#1 Regular 87 is supplied by Tank#1 and Tank#2 and is plumbed together to supply all Dispensers. <br /> f <br /> �� F+ F s r� <br /> !I N1 2 7 2017 <br /> ENIVIRONN ENTAI HEAT TH <br /> DEPARTMENT <br />
The URL can be used to link to this page
Your browser does not support the video tag.