My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2013 - 2018
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
Y
>
YOSEMITE
>
1711
>
2300 - Underground Storage Tank Program
>
PR0231455
>
COMPLIANCE INFO_2013 - 2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/6/2020 1:54:57 PM
Creation date
5/5/2020 4:53:14 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2013 - 2018
RECORD_ID
PR0231455
PE
2361
FACILITY_ID
FA0003612
FACILITY_NAME
Yosemite Avenue Arco AmPm
STREET_NUMBER
1711
Direction
E
STREET_NAME
YOSEMITE
STREET_TYPE
Ave
City
Manteca
Zip
95336
CURRENT_STATUS
01
SITE_LOCATION
1711 E Yosemite Ave
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
459
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCD,January 2002 Page of <br /> 5, SECONDARY PIPE TESTING _ <br /> Tcst Method Developed By: X Piping Manufacturer 0 Industry Standard n Professional.Engineer <br /> 0 Other(S,pecify) <br /> Test Method Used: X Pressure ❑Vacuum 0 Hydrostatic <br /> ❑Other(Specify) <br /> Test Equipment Used:Pressure Gauges in Psi/Nitrogen Equipment Resolution: 1,'10-15 Psi. <br /> Piping Run#1 Piping Run 42 Piping Run# Piping Run# <br /> Piping Material.: Fiberglass � Fiberglass <br /> Piping Manufacturer: Smith Snaith <br /> Piping Diameter: 3" 3" <br /> Length of Piping Run: Approx. 180' Approx..160' <br /> Product Stored: Regular 87/Regular 87 Super 91 _ <br /> Test Port at Test Port at I <br /> Method and location of UDC#38x4&"best UDC.#3&4&Test <br /> piping-ru,t isolation: boots at STP Piping boot at STP Piping <br /> Sumps#1&2 Sump 93 <br /> Wait time between applying <br /> ressure and stwtin test: 10 Minutes 10 Minutes <br /> Test Start Time, 10:30 10:40 UN 16 <br /> Initial Reading(R,): 5 Psi a Psi <br /> Test End Time: 11:30 11:40 <br /> Final.Reading(RF): 5 Psi 5 Psi -- <br /> Test Duration- µ I Hour I Hour <br /> Change in Reading(RF-Ra): 0 Psi 0 Psi. <br /> Pass/Fail Threshold or No Loss in Psi No Loss in Psi <br /> Criteria: <br /> Test Result: .Pass'.. Pass <br /> Comments—(include infornation on repairs made prior to testin , and recnmmendecl follow-up for failed tests) <br /> Secondary Pipe 41 Regular 87 is supplied by Tank#1 and Tank#2 and is plumbed together to supply all Dispensers. — <br />
The URL can be used to link to this page
Your browser does not support the video tag.