Laserfiche WebLink
SWRCB,January 2002 Page of <br /> 6. PIPING SVMP'VESTING <br /> Test Method Developed By: Q Sump Manufacturer D Industry Standard X Professional Engineer <br /> D Other(Spec) <br /> Test Method Used: 0 Pres3ure D Vacuum X Hydrostatic <br /> p Other(Specify) <br /> Test Equipment Used:Caldwell Level Change Indicator Equipment Resolution: .002 <br /> MM I <br /> Sump#1-87 Sump#2-87 Sump#3-91 Sump# <br /> Sump Diameter: 4$" 48" 483 <br /> 1 <br /> Sump Depth: 66" 65" 67" <br /> Sump Material: Fiberglass 'Fiberglass Fiberglass <br /> Height from Tank Top to Top of I Product 16" Product 12" Product 22" <br /> Hi est Piping Penetration: <br /> Height from Tank.Top to Lowest 40" 39" 41" <br /> Electrical Penetration: <br /> Condition of sump prior to testing: Dry Dry pry <br /> Portion of Sump Tested' Water Line 18" Water Line 14" Water Line 24" <br /> Does turbine shut down when <br /> sump sensor detects liquid(both Yes Yes Yes <br /> product and water)?O <br /> Turbine shutdown response time Not Alarmed Not Alarmed Not Alarmed <br /> 1s system programmed for fail-safe yes yea Yes <br /> shutdown?' <br /> Was fail-safe verified to be <br /> 4 No No No <br /> O tianal? , <br /> Wait time between applying water <br /> 5 Minutes 5 Minutes 5 Minutes nrnnrT�Ar�iT <br /> and startin test: <br /> Test Start Time: 9:40 10.30 11:20 <br /> Initial heading(Ri): ,001 _001 .001 <br /> Test ,n,d Time: 10:10 11:00 11:50 <br /> Final Reading(RF): .001 .001 .001 <br /> Test Duration: 30 Minutes 30 Minutes 30 Minutes <br /> Change in Reading(RF-Ri): 0 0 0 <br /> Pass/Fail Threshold or Criteria: .005130 Minutes .005/30 Minutes .005130 Minutes <br /> ss mssJ . <br /> ' less <br /> Was sensor removed for testing? Yes Yes Yes <br /> Was sensor properly replaced and Yes Yes yes <br /> verified functional after testin <br /> Comments—(include information on repairs made Priot to testi!& and recommended follow-u 'or failed tests) <br /> ' If the entire depth of the sump is not tested,specify how much was testcd. If the answer.to gay of the questions indicated with an <br /> asterisk(")is"NO"or"NA.",the entire sump must be tested. (See SWRCB 1..G-160) <br />