Laserfiche WebLink
1 <br /> C; <br /> SWRCB,January 2002 g <br /> 9. SPILL/OVERFILL CONTAINMENT BOXES M <br /> Facility is Not Equipped With Spill/Overfill Containment Boxes [ <br /> SpilllOverfill Containment Boxes are Present,but were Not Tested D V�Ro <br /> 'rest Method Developed By: D Spill Bucket Manufacturer r-Industry Standard DEpA I,� ' <br /> u Other(Spec) <br /> Test Method Used: n-Pressure D Vacuum f,*-Iydrostatic <br /> [J Other(Speck) <br /> Test Equipment Used: """— ,� j Equipment Resolution: I v <br /> Spill Box# Spill Box# Spill Box# Spill Box# <br /> Bucket Diameter: C " <br /> Bucket Depth: I .� <br /> Wait time between applying <br /> pressure/vacuum/water and <br /> starting test: <br /> Test Start Time: <br /> Initial Reading(Ri): z � <br /> Test End Time: ' <br /> Final Reading(RF): <br /> Test Duration: �-- <br /> Change in Reading(:RF-Rr): -- <br /> Pass/Fail Threshold or <br /> Criteria: <br /> Test Result: Pass 7 Fail i::'; Pass J Fail Pass !;Fail Pass Fall <br /> Comments—(include informafion on repairs made prior to testing,and recommended follow-u _forfailed tests) <br />