Laserfiche WebLink
Page 1 of 2 <br /> Vicki McCartney [EH] <br /> From: Vicki McCartney [EH] <br /> Sent: Monday, May 19, 2014 2:39 PM <br /> To: 'Magee, Amanda' <br /> Cc: Adrienne Ellsaesser[EH]; Nuel Henderson [EH]; John Yoakum [EH]; Lichtenberger, Deborah; <br /> Manning, Danielle <br /> Subject: RE: Variances for 7-Eleven Store No. 17334 <br /> Hi Amanda, <br /> I did not receive any photo attached to your email below, but based on your description of high-voltage electric <br /> lines running almost directly under the well box of MW-4, I concur that the remaining well box should not be <br /> removed. The risk is too great. <br /> am concerned about any future road construction that may involve monitoring well MW-4. I can only hope that <br /> grout applied under pressure will protect the groundwaterfromany surface contamination. <br /> I <br /> Vicki McCartney, Senior REHS <br /> San Joaquin County <br /> Environmental Health Department . <br /> 1868 East Hazelton Avenue <br /> Stockton, California 95205 <br /> Phone: (209)468-9852 <br /> Email: vmccartney a sjcehd.com <br /> From: Magee, Amanda [mailto:Amanda.Magee@stantec.com] <br /> Sent: Monday, May 19, 2014 1:34 PM <br /> To: Vicki McCartney [EH] <br /> Cc: Adrienne Ellsaesser [EH]; Nuel Henderson [EH]; John Yoakum [EH]; Lichtenberger, Deborah; Manning, <br /> Danielle <br /> Subject: RE: Variances for 7-Eleven Store No. 17334 <br /> Hi Vicki, <br /> After speaking with PG&E and our driller's health and safety team, Stantec respectfully requests to <br /> leave the MW-4 well box in place. As we discussed last week, there are high-voltage electric lines <br /> running almost directly under the well box (see attached photo'). According to the engineers at <br /> PG&E, the depth of the lines cannot be confirmed, but they may be shallower than 24" bgs. Also, <br /> they will not turn off that section of line,as that would result in a loss of power to their customers. <br /> Our drillers do not feel.it is safe to jackhammer out the concrete pad and well box in such close <br /> proximity to active high-voltage electric lines. <br /> On Friday, May 16, the well was pressure grouted to the surface. The metal ring at the top of the <br /> well box was removed and the void was filled with concrete. Please let me know if this will be an <br /> acceptable alternative to removing the entire well box. <br /> Thank you, <br /> 5/19/2014 <br />