My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_1999
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
Y
>
YOSEMITE
>
1711
>
2300 - Underground Storage Tank Program
>
PR0231455
>
INSTALL_1999
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/6/2020 4:58:34 PM
Creation date
5/6/2020 2:47:12 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
1999
RECORD_ID
PR0231455
PE
2361
FACILITY_ID
FA0003612
FACILITY_NAME
Yosemite Avenue Arco AmPm
STREET_NUMBER
1711
Direction
E
STREET_NAME
YOSEMITE
STREET_TYPE
Ave
City
Manteca
Zip
95336
CURRENT_STATUS
01
SITE_LOCATION
1711 E Yosemite Ave
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
171
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
FEB 05 '99 14:40 FP OhlTA I hdP IEhJT SOLUT I Oh;8814 542 5820 TO 9-15108958426 P.02/20 <br /> CONTAINMENT <br /> SOLUTIONS <br /> A ZENAU COMPANY <br /> PLEASE REVIEW THE FOLLOWING INFORMATION AND FORWARD TO YOUR <br /> FIELD SUPERVISOR TO AVOID DELAYS . ANY DELAYS ON SITE DUE TO <br /> PERSONNEL OR TANK(S) NOT PREPARED PROPERLY WILL INCREASE JOB <br /> COST. <br /> Under-round Tank Entre For Inspeenon or Remanufacturing Pate 1 of 3 <br /> 1. Reinforce or shore sides of excavation so pad will not undermine, and material will not <br /> migrate into excavated hole (per OSHA Standard 1926.650 through 1926.652) <br /> - Entry through encap - will require one half of endcap diameter exposed The area <br /> excavated should start N here the end cap begins to curve downward. Die down 14', back 6'. <br /> and 8' wide. (See drawing attached) <br /> - Entry through manway- already installed in tank, will require the removal of all <br /> pumps or vents installed in the manway lid. The full 22" diameter manway opening will be <br /> utilized for tank entry, so it cannot be obstructed in any way. Loosen the manway coyer <br /> before the Technician arrives on site. <br /> 2. Tank must be empty of fuel ( within 1" of bottom of tank ) - Note: The Technician will <br /> vent the tank to atmosphere to lower explosion levels in the tank to less than 10% LEL. <br /> Get the tank as empty as possible. The more product removed from the tank will reduce the <br /> time required by the technician to vent. <br /> 3. An open top 55 gallon drum must be provided for Technician's use for removing or <br /> soaking up ani• residual product left in the tank. This drum is considered hazardous waste, <br /> and will be the responsibility of the owner or contractor to dispose of accordingly. If the <br /> tank is extremely dirty- you may be r1equired to contract the services of a tank cleaninc., <br /> company <br /> 4. A safety person must be available to assist the Technician at all times. This person must <br /> be clean shaven, and able to speak English. This person must have no other duties other <br /> than assisting and monitoring the Technician. This person is supplied by the owner or <br /> contractor. The same safety person should be assigned each day. This will minis ize the <br /> �:�o ronniro r� :.�c�.� n�:A1r. tALe 0o� Ljy JJo&OnA nw JJ- m..nn.aren e 1r nnl i.ae <br /> Lu uc 1 G1.j Ytl Gtl tl1Ju UV LLL I� NLG JC1Gl� ycl JVI1 V)1 �.Il VFf GI �.l1 V,rGuul cJ Gllu j./V 11Y1cJ. <br /> NOTE: The safety person MUST have a completion of 40 HOURS OF TR.ALNL-G <br /> IN THE FIELD APPLICATIONS OF HEALTH AND SAFETY in compliance with <br /> OSHA 29 CFR 1910.120 (HAZWOPER). <br />
The URL can be used to link to this page
Your browser does not support the video tag.