My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_1999
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
Y
>
YOSEMITE
>
1711
>
2300 - Underground Storage Tank Program
>
PR0231455
>
INSTALL_1999
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/6/2020 4:58:34 PM
Creation date
5/6/2020 2:47:12 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
1999
RECORD_ID
PR0231455
PE
2361
FACILITY_ID
FA0003612
FACILITY_NAME
Yosemite Avenue Arco AmPm
STREET_NUMBER
1711
Direction
E
STREET_NAME
YOSEMITE
STREET_TYPE
Ave
City
Manteca
Zip
95336
CURRENT_STATUS
01
SITE_LOCATION
1711 E Yosemite Ave
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
171
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
e <br /> FEB 05 '99 14:41 FFA CONTAINMENT S1-LUT I OPdS814 542 5020 TO 9—J S 1009579426 P.03/20 <br /> S. No fuel deliveries can be made to any tank oa site while technician is inside a tank. <br /> - - b. When tank en y is required by the Tccl�si:l7;-a person trained in CPR must be beside <br /> the entry hole at all times when the Technician '.s inside the tank. This person is in addition <br /> to the safety person. If one is not available from the contracting crew, an off duty fireman, <br /> nurse, EDIT, or equivalent is acceptable. Besides administering CPR, the person will assist <br /> the safety person should an emergence rescue be required. <br /> i. Our Technician will perform an air/soap tightness test confirming his repairs to the <br /> exterior of tank, and possibly identify any other potential problems on the exposed areas of <br /> the tank, All efforts must be made to isolate, disconnect, or plug all the piping on tank. If <br /> this test is done, and at a later date another pro'�lem with the tank is identified, it will be the <br /> financial responsibility of the owner or contractor to schedule a return trip to the site <br /> S. It is important that the contractor or owner contact the appropriate local and state <br /> authorities for regulations concerning the jobsite. lobsite permits may need to be obtained <br /> for the excavation or remanufacture of the tank Regulations ;,governing testing of <br /> underC7rourid tanks should be determined so Technician can be advised. <br /> 9. The contractor must disconnect the electrica; supply and remove the pump from the <br /> tank. The product line at the pump must also be disconnected or capped. This will insure <br /> no fuel can enter the tank while Technician is working. <br /> 10. The water table in the tank hole must be controlled at all times. The Technician is <br /> unable to remanufactur interior or exterior surfaces if they are wet. Controlling the water <br /> table will also prevent the tank from floating. <br /> 11. Tanks to be entered, must be triple rinsed and defumed prior to technician's arrival. <br /> Page 2 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.