My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_1999
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
Y
>
YOSEMITE
>
1711
>
2300 - Underground Storage Tank Program
>
PR0231455
>
INSTALL_1999
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/6/2020 4:58:34 PM
Creation date
5/6/2020 2:47:12 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
1999
RECORD_ID
PR0231455
PE
2361
FACILITY_ID
FA0003612
FACILITY_NAME
Yosemite Avenue Arco AmPm
STREET_NUMBER
1711
Direction
E
STREET_NAME
YOSEMITE
STREET_TYPE
Ave
City
Manteca
Zip
95336
CURRENT_STATUS
01
SITE_LOCATION
1711 E Yosemite Ave
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
171
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
u4%26%99 17: 14 FAX 425 251 8792 BARGIUUSEN &12 <br /> 04/25/1999 07:11 7146795420 EH5 ARCO LA PALMA PAGE 14 <br /> A. Contact ARCD Maintenance or its designated agent liby using <br /> the telephone number previously provided_ <br /> B. Tag the dispenser "out of order" untll the liquid has been <br /> removed by authorized persons.. <br /> ARCO RESPONSIBILrnES <br /> Method of removing an unauthorized release from the spill <br /> containment device: <br /> A. Any unauthorized release into the containment box will be <br /> removed by ARCO in accordance with Califomia Health and <br /> Safety Code requirements. In the event of an emergency, a <br /> pumping contractor or truck will be available immediately. In <br /> all other cases, equipment availability will be within 12 hours. <br /> B. ARCO Maintenance will be responsible for authorizing and <br /> selecting contractors for the work to be performed. <br /> 5. TRAINING <br /> All-employees must be trained In the subject mentioned In Sections 3 <br /> and 4 above. Training needed for the operation of the dispenser <br /> containment devices shall include how to inspect the equipment and <br /> to manually close -he dispenser impact valve. <br /> CAiTD1=-VCC a.. <br /> f <br />
The URL can be used to link to this page
Your browser does not support the video tag.