Laserfiche WebLink
A <br /> Y <br /> Chevron SS #9-646 February 22, 1990 <br /> Stockton, California Project #1148 <br /> computer. Water from the test will be discharged to the sanitary sewer once <br /> permitted. <br /> The pumping test will be conducted after well #9 has been constructed, and after <br /> the water discharge permit has been obtained. The test results will be sent to <br /> Chevron within one week after the test has been completed. As always, we are <br /> available to answer any questions you-may have. Please feel free to contact us at <br /> your convenience. <br /> Very Truly, <br /> CHEMICAL PROCESSORS, INC. <br /> James R. Phillips <br /> Engineerrp-o�ji <br /> i <br /> c <br /> David C. Ti&ht <br /> Site Remediation Manager <br /> I <br /> i <br /> I <br /> Chemical Processors, Inc. Page 2 <br />