Laserfiche WebLink
� + <br /> °,aurie Cotulla <br /> September 25, 1986 <br /> Page 2 <br /> 3. Undisturbed soil samples will be collected from all borings <br /> at a minimum of five foot intervals. The soil sample collection <br /> and preservation shall be conducted in accordance with the ' <br /> att=ached Groundwater Technology's Standard Operating Procedures <br /> i <br /> SOP 14 and 15. <br /> As required, an application permit and filing fee for the <br /> wrings and installation of the monitoring wells are attached. <br /> The authorization to release analytical results, geotechnical <br /> data, and a site assessment information form ' s being forwarded <br /> to the client for their signatire. Grcundwater Technology <br /> Intends to begin 'the drilling on Thursday, September 25, 1986. <br /> If you have any questions or require additional information <br /> plaase call. <br /> Respectfully, <br /> GROUNDWATER TECHNOLOGY, INC. <br /> i Robert 1 Fun �al/ ! <br /> i <br /> lo <br /> Project Geo st <br /> j <br />