My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2016 - 2018
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LOUISE
>
85
>
2300 - Underground Storage Tank Program
>
PR0231656
>
COMPLIANCE INFO_2016 - 2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/26/2022 2:27:53 PM
Creation date
5/7/2020 9:58:01 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2016 - 2018
RECORD_ID
PR0231656
PE
2351
FACILITY_ID
FA0003635
FACILITY_NAME
ARCO 06080
STREET_NUMBER
85
Direction
E
STREET_NAME
LOUISE
STREET_TYPE
AVE
City
LATHROP
Zip
95330
APN
19627010
CURRENT_STATUS
01
SITE_LOCATION
85 E LOUISE AVE
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
410
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
OPW Installation, Operation, and Maintenance Manual, Page 48 Executive Order VR-1 02-1 <br /> GENERAL INSTRUCTIONS <br /> The OPW 71 SO Overfill Prevention Valve is Normal Operation:A Hose"Kick"and reduced flow <br /> designed for tight fill, gravity drop applications to signal that the tank is full. Close transport delivery <br /> help prevent accidental or intentional overfilling of valve and drain hose into tank before disconnecting <br /> underground storage tanks. It is installed in the UST any hose fitting. <br /> drop tube in place of a standard drop tube. <br /> The main 71SO valve closes when liquid level is at Overfilled Tank:Failure of the hose to drain after <br /> 95%of the top of the tank. A small bypass valve closing the delivery valve signals an overfilled tank. <br /> remains open to allow the delivery hose to drain at Do Not Disconnect any delivery hose fitting until the <br /> 3-5 gallons per minute. If the delivery truck valve is liquid level in the tank has been lowered to allow the <br /> not closed after initial shut-off,the bypass valve will hose to drain into the tank. Attention: In the event <br /> close and will restrict all fuel delivery. you are splashed, remove all wetted clothing <br /> immediately. Do not go into an enclosed area and <br /> The 71 SO models of the 71 SO are designed to be stay away from ignition sources. <br /> installed with the following OPW products:Face Seal <br /> Adaptor, OPW Spill Container or Multi-port,Jack IMPORTANT <br /> Screw Kit, Rotatable Product Adaptor, and Product Determine if the underground storage tank is <br /> Cap. equipped with a ball float vent valve,as <br /> illustrated in Figure 24. In all systems,the shut- <br /> IMPORTANT off point of the 71 SO must be reached before the <br /> Read these assembly and installation instructions ball float reduces flow to ensure proper overfill <br /> completely and carefully prior to starting. Check to valve operation. <br /> make sure all parts have been provided. Use only <br /> the parts supplied;substitution of parts may cause <br /> product failure. TOOLS NEEDED FOR INSTALLATION AND <br /> ASSEMBLY: <br /> Failure to follow instructions may cause improper 1. 71 SO-TOOL(includes the following) <br /> product operation or premature failure which may a. Sharp 3/16"drill bit with stop <br /> permit storage tank overfill. An overfilled storage b. Punch <br /> tank may create hazardous conditions and/or 2. Drill <br /> environmental contamination. 3. Hammer <br /> 4. Tape measure <br /> CAUTION 5. Hacksaw or cut-off saw,fine tooth;24 teeth/inch <br /> Do not remove elastic band from around float until 6. Fine half round file <br /> instructed to do so,as damage to valve may result. 7. Screwdriver-Phillips blade <br /> 8. Fine grit sandpaper/steel wool <br /> WARNING 9. Grease, black moly <br /> Failure to properly connect delivery hose and elbow, 10. Torque Wrench <br /> and/or disconnecting a liquid filled delivery hose or 11. Band clamp(3-3/4"diameter minimum) <br /> elbow will result in a hazardous spill, which may <br /> result in personal injury, property damage,fire, WARNING <br /> explosion,and water and soil pollution. Using electrically operated equipment near gasoline <br /> • Make sure all connections, including the hose or gasoline vapors may result in fire or explosion, <br /> and elbow connections, between storage tank causing personal injury and property damage. <br /> and transport are securely coupled. Check to assure the working area is free from such <br /> • Make sure the lip seal and/or all gaskets in the hazards, and always use proper precautions. <br /> delivery elbow are properly in place to prevent <br /> spills. IMPORTANT:The figures in this installation and <br /> • Do not operate with damaged or missing parts, maintenance instruction may contain vapor recovery <br /> which prevent tight connections. equipment(including model numbers)that is not <br /> certified by the California Air Resources Board <br /> (CARE)for a specific Phase I Vapor Recovery <br /> System. Please refer to Exhibit 1 of the appropriate <br /> CARB Phase I Executive Order for a list of certified <br /> Phase I Vapor Recovery System Equipment. <br /> OPW 71 SO Overfill Prevention Valve Page 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.