Laserfiche WebLink
i <br /> City of Stockton Fire Station Jib <br /> Soil Remediation Plan <br /> Site Code 1013 <br /> June 24, 1992 <br /> Page 5 <br /> l <br /> Report Preparation <br /> Upon completion of field activities and receipt of laboratory analysis, RESNA will prepare a <br /> technical report summarizing field methods and data collected during the remediation/excavation <br /> if appropriate, this report will be incorporated into the next quarterly monitoring report in the <br /> second 1992 quarterly report due in July of 1992. <br /> Field work proposed in this workplan will be performed according to the Site's Quality <br /> Assurance/Quality Control guidelines and Health and Safety Plan included in Attachments I and <br /> I' II, respectively. <br /> RESNA is prepared to begin work in accordance with this workplan within two weeks of agency <br /> approval. If you have any questions or concerns regarding this addendum or project, please <br /> contact John P. Lane at (209) 838-3507, at your earliest convenience. <br /> Respectfully, <br /> RESNA Industries, Inc. <br /> SAN JOAQUIN COUNTY E <br /> PUBLIC HEALTH SERVICES <br /> 9, ENVIRONMENTAL HEALTH DIVISION <br /> lir Tom J. LuttermanK P.0. BOX 2009, STOCKTON,CA 95021 <br /> Staff Geologist PHONE: (209).468-3420 <br /> Approved <br /> ❑ Approved with changes: See Remarks <br /> enPane <br /> Project Geologist ❑ Disappr ved; See Remarks <br /> Remarks Ulf+L1 <br /> IV <br /> Gregory P. Stahl Date y f <br /> A HAL- <br /> CA Registered Geologist No. 5023A. <br /> Approval of these plans extends only to that <br /> which is shown and described hereon but <br /> TJL/ggk does not authorize or approve any omission <br /> or deviation of reg4irements of State laws of <br /> PC: Mr. Jim Escobar local Ordinances. <br /> Mr. James B. Giottonini <br /> SFS692.T1L <br />