My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
N
>
NEWTON
>
3400
>
2900 - Site Mitigation Program
>
PR0545610
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2020 12:41:13 PM
Creation date
5/7/2020 12:27:52 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0545610
PE
2952
FACILITY_ID
FA0003920
FACILITY_NAME
JKC TRUCKING INC
STREET_NUMBER
3400
STREET_NAME
NEWTON
STREET_TYPE
RD
City
STOCKTON
Zip
95205
CURRENT_STATUS
02
SITE_LOCATION
3400 NEWTON RD
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
178
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
07 May 1999 <br /> AGE-NC Project No. 99-0592 <br /> Page 2 of 2 <br /> • Benzene, toluene, ethylbenzene and total xylenes (BTEX) and MTBE in accordance with <br /> EPA Method 8020; and <br /> • Fuel oxygenates including MTBE, TBA,DIPE, ETBE, and TAME in accordance with EPA <br /> Method 8260. <br /> Each soil sample will be labeled with location, time, date, and sampler's initials following sample <br /> collection. Soil samples will be placed in a chilled container under ice and transported under chain- <br /> of-custody procedures. <br /> Based on the results of the laboratory analysis and approval by PHS-EHD, if impact is relatively <br /> low, soil designated as Stockpile No. 3 will be used as backfill for the former UST excavation area. <br /> Backfill procedures will be scheduled following approval. PHS-EHD will be notified prior to <br /> backfilling the excavation. <br /> STOCKPILE NOS. 1. 2.AND 4 <br /> Stockpile No. 1, 2, and 4 have an approximate combined volume of 100 cubic yards. Based on the <br /> analytical results presented to AGE for samples SP-1, SP-2, and SP-4, the concentrations of <br /> hydrocarbon-impact to the soil would restrict the use of the stockpiled material as backfill. Based <br /> on this data, AGE proposes to transport and dispose of stockpiled soils designated as stockpile No. <br /> 1, 2, and 4 to an appropriate landfill facility. Work will be scheduled following approval from PHS- <br /> EHD. <br /> AGE has scheduled the soil sampling of Stockpile No. 3 for 12 May 1999 at 10:00 am. If you have <br /> any questions or comments,please contact our office at (209) 467-1006. <br /> Sincerely, <br /> Advanced GeoEnvironmental, Inc. <br /> Tony ikacich <br /> Staff Geologist <br /> Enclosure <br /> cc: Mr. Eric Weilburg - Moore Truck Lines <br /> Advanced GeoEnviron mental,Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.