My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
PINE
>
845
>
3500 - Local Oversight Program
>
PR0545658
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2020 3:11:21 PM
Creation date
5/7/2020 2:50:12 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0545658
PE
3528
FACILITY_ID
FA0004925
FACILITY_NAME
Caltrans-Lodi
STREET_NUMBER
845
Direction
E
STREET_NAME
PINE
STREET_TYPE
St
City
Lodi
Zip
95240
CURRENT_STATUS
02
SITE_LOCATION
845 E Pine St
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
69
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PUBLI& HEALTH SEkVICES <br /> SAN JOAQUIN COUNTY 4V <br /> ENVIRONMENTAL HEALTH DIVISION <br /> Karen Furst, M.D., M.P.H., Health Officer d.. <br /> 304 East Weber Avenue,Third Floor • Stockton, CA 95202 <br /> ;`off;,;: <br /> 209/468-3420 <br /> SAIYED ALI <br /> CALTRANS DISTRICT 10 <br /> P' O BOX 2048 <br /> STOCKTON CA 95201 <br /> RE: Caltrans Lodi Maintenance Station Site Code: # 1363 <br /> 845 E.Pine Street <br /> Lodi CA 95240 <br /> WORK PLAN—: Work Plan,Draft,Subsurface Soil and Groundwater Investigation <br /> DATED: February 4,2002 <br /> PREPARED BY: IT Corporation <br /> APPROVED: R <br /> DISA PROVED: <br /> ADDENDUM NEEDED: ubmit by: <br /> ADEQUATE AND NECESSARY ELEMENTS OF THE WORK PLAN [H&S 25299.37,subd(c)(3)1: <br /> 1. Advancement of two direct push Geoprobe soil borings to approximately 100-feet bsg. The borings will be located <br /> near a former underground storage tank.' Up to 20 soil samples will be collected from one boring,up to 20 discrete <br /> groundwater samples will be collected from the other boring. <br /> 2. Samples will be analyzed for TPHg,TPHd,BTEX and fuel oxygenates,by approved EPA Methods listed in the work <br /> plan,as well as for other aromatic and halogenated volatile organics and an elements scan. <br /> 3. Following collection of all samples,the borings will be properly destroyed from total depth with neat cement grout. <br /> 4. A report of findings will be prepared and submitted to SJC/EHD following completion of the fieldwork. <br /> COMMENTS AND CONDITIONS: <br /> 1. A site specific Health&Safety Plan must be submitted to SJC/EHD prior to initiation of fieldwork. <br /> 2. The report of findings must be submitted to SJC/EHD within 60-days following completion of the fieldwork. <br /> 3. A SJC/EHD well permit application and required permit fee have been submitted. <br /> DATED a D Z BY GL cwi.� <br /> Lori Duncan.Senior REHS (209)468-0337 <br /> cc: Martha Adams,IT Corporation(by fax) <br /> i <br /> A Division of San Joaquin County Health Care Services <br />
The URL can be used to link to this page
Your browser does not support the video tag.