Laserfiche WebLink
,I <br /> page 2 <br /> 845 Pine Street <br /> Current review of the site indicates that analysis for methyl tertiary butyl ether (MtBE) <br /> was never performed on any of the samples. Before this site can be considered for <br /> closure, analysis of a groundwater sample must be completed and must include analysis <br /> for 1,2-dichloroethane, ethylene dibromide and fuel oxygenates including MtBE by EPA <br /> Method 8260. Please submit a work plan to PHS/EHD for completion of this work. The <br /> work plan is due July 13, 2001. <br /> If you have any questions or comments please call Lori Duncan at (209) 468-0337. <br /> Donna Heran, REHS, Director <br /> Environmental Health Division <br /> Cit <br /> Lori Duncan, Senior REHS Dot Lofstrom, R.G. <br /> LOP/Site Mitigation Unit IV Engineering Geologist <br /> cc: Marty Hartzell, CVRWQCB <br />