My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
R
>
RIVER
>
18700
>
2900 - Site Mitigation Program
>
PR0541559
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2020 3:08:53 PM
Creation date
5/7/2020 3:01:02 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0541559
PE
2965
FACILITY_ID
FA0023827
FACILITY_NAME
MCMANIS FAMILY VINEYARDS
STREET_NUMBER
18700
Direction
E
STREET_NAME
RIVER
STREET_TYPE
RD
City
RIPON
Zip
95366
APN
24522020
CURRENT_STATUS
01
SITE_LOCATION
18700 E RIVER RD
P_LOCATION
05
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RECEIVE �,'-C Be.. . <br /> DEC 15 2016 MATTHEW TA,FFOVEZ <br /> GMLPITMv FOR <br /> VWONMGNiai aNOlaCi,Ox <br /> Water Boards ENVIRONMENTAL HEALTH <br /> Central Valley Regional Water Quality Control Board <br /> PERMIT/SERVICES <br /> 9 December 2016 <br /> Justin McManis CERTIFIED MAIL <br /> McManis Family Vineyards 91 7199 9991 7035 8421 0710 <br /> 18700 E. River Road <br /> Ripon, CA 95366 <br /> NOTICE OF ADOPTION <br /> OF <br /> ORDER R5-2016-0097 <br /> WASTE DISCHARGE REQUIREMENTS <br /> FOR <br /> MCMANIS FAMILY VINEYARDS, INC <br /> SAN JOAQUIN COUNTY <br /> Waste Discharge Requirements (WDRs) Order R5-2016-0097 for McManis Family Vineyards was <br /> adopted by the Central Valley Regional Water Quality Control Board on 6 December 2016. <br /> Although the WDRs allow wastewater discharge to land, the discharge is a privilege not a right and <br /> may be revoked at any time. A copy of the Order must be maintained at the facility and must be <br /> accessible to anyone operating the wastewater system. Please note that the Provisions section of the <br /> WDRs requires submittal of certain technical reports by the dates provided in the Order. The required <br /> submittals include the items listed in the following table. <br /> Required Reports Due Date <br /> Wastewater System Design and Construction Quality <br /> Assurance Plan and a Flow Metering System 1 April 2017 <br /> Improvement Plan <br /> Groundwater Monitoring Well Installation Report 1 May 2017 <br /> Background Groundwater Quality Study Report and a 30 January 2018 <br /> Groundwater Limitations Compliance Assessment Plan <br /> Land Application Area Completion Report At least 30 days prior to discharge to <br /> the Land Application Area <br /> Best Practicable Treatment or Control Workplan 1 September 2017 <br /> Wastewater Treatment Facility Improvements At least 60 days before the flow rate is <br /> Completion Report increased after construction <br /> Within 60 days after submittal of the <br /> Operation and Management Plan (O&M Plan) Wastewater Treatment Facility <br /> Improvements Completion Report <br /> KARL E. LON6LEv SOU. P.E..ONuR I PAMELA C. CREEOON P.E., BCEE, EXECUTIVE OFFICER <br /> 11020 Sun Canter Drive#200.RanChO Cordova.CA E5E10 .I www.waterboard$.Ca.90V/Centr8lVal'Oy <br /> (j nwrcuo rnvea <br />
The URL can be used to link to this page
Your browser does not support the video tag.