My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
R
>
RIVER
>
18700
>
2900 - Site Mitigation Program
>
PR0541559
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2020 3:08:53 PM
Creation date
5/7/2020 3:01:02 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0541559
PE
2965
FACILITY_ID
FA0023827
FACILITY_NAME
MCMANIS FAMILY VINEYARDS
STREET_NUMBER
18700
Direction
E
STREET_NAME
RIVER
STREET_TYPE
RD
City
RIPON
Zip
95366
APN
24522020
CURRENT_STATUS
01
SITE_LOCATION
18700 E RIVER RD
P_LOCATION
05
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Justin McManis 2 9 December 2016 <br /> McManis Family Vineyards, Inc. <br /> In addition to technical reports required by the WDRs, the WDRs include a Monitoring and Reporting <br /> Program (MRP), which specifies monitoring and reporting requirements for you to implement. Please <br /> review the MRP closely so that you may establish appropriate sampling schedules and reporting <br /> protocols. The required monitoring report submittal dates are in the table below. <br /> Required Monitoring Reports Due Date <br /> Monthly Monitoring Reports 1st day of second month following the sampling (the <br /> January Report is due by 1 March) <br /> Quarterly Monitoring Reports 1° day of the second month after the quarter(January- <br /> March quarter report is due by 1 May) <br /> Annual Monitoring Reports 1 February of each year <br /> Please be advised that the monitoring reports must be submitted on time and complete. Monitoring <br /> reports must include all of the items described in the Reporting Section of the MRP. Monitoring reports <br /> must be accompanied by a completed Monitoring Report Transmittal Sheet (blank copy enclosed). <br /> The first monthly monitoring report required under this Order is due on 1 March 2017 and is to cover <br /> the month of January 2017. <br /> Report Submittals <br /> All monitoring and technical reports should be converted to searchable Portable Document Format <br /> (PDF) and submitted electronically. Documents that are less than 50 MB should be emailed to: <br /> centralvalleysacramento@waterboards.ca.gov. <br /> To ensure that your submittal is routed to the appropriate staff person, the following information should <br /> be included in the body of the email or any documentation submitted to the mailing address for this <br /> office: <br /> Facility Name: McManis Family Vineyards, Inc. <br /> Program: Non-15 Compliance Order: R5-2016-0097CIWQS Place ID: 252876 <br /> Documents that are 50 MB or larger should be transferred to a CD, DVD, or flash drive and mailed to: <br /> Central Valley Regional Water Quality Control Board <br /> ECM Mailroom <br /> 11020 Sun Center Drive, Suite 200 <br /> Rancho Cordova, CA 95670 <br /> To conserve paper and reduce mailing costs, a paper copy of the Order has been sent only to the <br /> Discharger. Interested parties are advised that the full text of this Order is available at: <br /> http://www.waterboards.ca.gov/centralvalley/board decisions/adopted orders/. Anyone without <br />
The URL can be used to link to this page
Your browser does not support the video tag.