Laserfiche WebLink
i <br /> ' SECTION 02010 <br /> 3 SUBSURFACE CONDITIONS <br /> a <br /> s <br /> s PART 1: GENERAL <br /> 7 <br /> e 1.01 GENERAL <br /> e <br /> 10 The Contractor should visit the site and acquaint himself with all existing conditions. Prior <br /> >> to bidding, bidders may make their own subsurface investigations to satisfy themselves as <br /> 12 to site and subsurface conditions but such subsurface investigations shall be performed <br /> ' 13 only under time schedules and arrangements approved in advance by the Engineer. <br /> 14 <br /> 15 1.02 QUALITY ASSURANCE <br /> 1s <br /> 17 A Soil Engineer will be retained by the Agency to provide testing and inspection of work <br /> 18 in connection with excavating, filling, compacting, and grading. <br /> 1s <br /> ' 2 <br /> 211 <br /> 22 <br /> 23 END OF SECTION <br /> 1 <br /> 1 <br /> SUBSURFACE CONDITIONS <br /> ' 062794 02010-1 <br />