Laserfiche WebLink
1 deficiencies that need to be corrected before final acceptance and issue a Notice of ' <br /> 2 Substantial Completion with the deficiencies noted. <br /> 3 <br /> 4 C. If Engineer determines that the work is not substantially complete, he will immediately notify ' <br /> 5 Contractor, in writing, stating reasons. After completing work, Contractor shall resubmit <br /> 8 certification and request a new final inspection. <br /> 7 <br /> 8 3.04 ACCEPTANCE OF THE WORK , <br /> s <br /> 10 A. After all deficiencies have been corrected, a Letter of Final Acceptance will be issued. <br /> 11 <br /> iz B. Acceptance may be given before correction of deficiencies that do not prevent operation <br /> 13 and use of the facility; however, final payment will be withheld until all deficiencies are <br /> 14 corrected. , <br /> 15 <br /> 18 C. Until receipt of Letter of Final Acceptance, Contractor shall be responsible for the work of <br /> 17 this Contract. <br /> 18 '19 3.05 STARTUP/TRAINING <br /> 20 <br /> 21 Demonstrate systems and instruct Owner personnel in correct operation. Familiarize them , <br /> 22 with locations of switches, junction boxes, and circuiting. <br /> 23 <br /> 24 3.06 CLOSEOUT SUBMITTALS <br /> 2s ,zs A. Submit before payment request. <br /> 27 <br /> 28 B. Proiect Record Drawings: As specified above. , <br /> 29 <br /> 30 C. Guarantees and Bonds: As specified in individual sections. <br /> 31 <br /> 32 D. Spare Parts and Materials: As specified in individual sections. , <br /> 33 <br /> 34 E. Keys and Keying Schedule: Submit all keys including duplicates. Wire all keys for each <br /> 35 lock securely together. Tag and plainly mark with lock number or equipment identification, <br /> 36 and indicate physical location, such as building and room name or number, or panel or <br /> 37 switch number. <br /> 38 <br /> 39 F. Operating Handles and Special Tools: Clearly identify as to related equipment. <br /> 40 <br /> 41 G. Final Operating and Maintenance Instructions: See Section 01010, Part 3.09. <br /> 42 ,43 3.07 POST-CONSTRUCTION INSPECTION <br /> 44 <br /> 45 Before expiration of guaranty period, Engineer will inspect project and notify Contractor in ' <br /> 48 writing of all deficiencies. <br /> 47 <br /> 48 <br /> 49 END OF SECTION r <br /> CONTRACT CLOSEOUT <br /> 050594 01700-2 ' <br />