My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
R
>
REPUBLIC
>
14720
>
2900 - Site Mitigation Program
>
PR0542085
>
ARCHIVED REPORTS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2020 3:18:39 PM
Creation date
5/7/2020 3:08:28 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
RECORD_ID
PR0542085
PE
2965
FACILITY_ID
FA0010858
FACILITY_NAME
SJC PUBLIC WORKS /UTILITY-FLAG CITY
STREET_NUMBER
14720
STREET_NAME
REPUBLIC
STREET_TYPE
St
City
LODI
Zip
95242
APN
05532009
CURRENT_STATUS
02
SITE_LOCATION
14720 Republic St
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
321
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br /> I No fill shall be placed during weather conditions which will alter the moisture content of the <br /> 2 fill materials sufficiently to make adequate compaction impossible. After placing operations <br /> 3 have been stopped because of adverse weather conditions, no additional fill material shall <br /> 4 be placed until the last layer compacted has been checked and found to be compacted to <br /> 5 the specified densities. <br /> s <br /> 7 The finished levee surfaces shall be made reasonably smooth and free from irregular <br /> 8 surface changes, and to the dimensions shown on the plans. <br /> 9 <br /> 10 3.04 BACKFILL AGAINST STRUCTURES <br /> 11 <br /> 12 Material for filling and backfilling around structures shall be free from sod, large lumps, <br /> 13 boulders, or rocks, roots, concrete, brush or other objectionable material, and shall be <br /> 14 obtained from required excavations insofar as practicable. Should the material available <br /> 15 from excavation be insufficient or unsuitable for the required use, the Contractor shall <br /> 15 furnish and place suitable material. Do not place backfill against newly constructed <br /> 17 concrete structures for a period of 14 days unless authorized by the Engineer. Hand-held <br /> 18 compactors shall be used for backfill against concrete walls. <br /> 19 <br /> 20 3.05 EMBANKMENT SURFACING <br /> 21 <br /> 22 Aggregate base shall be placed as specified in Paragraph 3.01, Section 02513. <br /> 23 <br /> 24 3.06 EROSION PROTECTION <br /> 25 <br /> 25 Erosion Protection shall be applied as specified in Section 02492. <br /> 27 <br /> ze 3.07 CLEANUP <br /> 29 <br /> 30 After completing all earthwork on embankments, the Contractor shall leave the site in a neat <br /> 31 and clean condition, doing such grading as is required by the plans. <br /> 32 <br /> 33 <br /> 34 <br /> 35 END OF SECTION <br /> r <br /> r <br /> EMBANKMENT CONSTRUCTION <br /> 062794 02226-3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.