My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
R
>
REPUBLIC
>
14720
>
2900 - Site Mitigation Program
>
PR0542085
>
ARCHIVED REPORTS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2020 3:18:39 PM
Creation date
5/7/2020 3:08:28 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
RECORD_ID
PR0542085
PE
2965
FACILITY_ID
FA0010858
FACILITY_NAME
SJC PUBLIC WORKS /UTILITY-FLAG CITY
STREET_NUMBER
14720
STREET_NAME
REPUBLIC
STREET_TYPE
St
City
LODI
Zip
95242
APN
05532009
CURRENT_STATUS
02
SITE_LOCATION
14720 Republic St
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
321
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br /> 1 excavation and embankment construction are to be conducted, or storage of excavated <br /> 2 materials or fill is to be made. Stripping shall be minimal so as not to remove much of <br /> 3 underlying soil (maximum 4 inches). <br /> 4 <br /> 5 All cleared material shall become the property of the Contractor and shall be disposed of <br /> 6 at a location off the site in a manner satisfactory to the Engineer at the Contractor's <br /> 7 expense. <br /> 8 ,9 3.02 EXCAVATION <br /> 10 <br /> 11 A. Excavation in ponds shall be done to the dimensions and levels indicated on the drawings <br /> 12 or specified herein. Excavated material, after approval of Engineer, shall be used for <br /> 13 embankment construction. <br /> 14 <br /> 15 B. Disposal of Waste Excavation: Excavated material determined by the Engineer to be <br /> 16 unsuitable, or in excess of the amounts required for embankments, shall be disposed on <br /> 17 site at no additional cost to the Owner at locations shown on the plans. <br /> 18 i 19 3.03 EMBANKMENTS <br /> 20 <br /> 21 A. General: All embankments shall be made using engineered fill, carefully controlled and <br /> 22 compacted on a prepared surface. <br /> 23 <br /> 24 B. Surface Preparation: The surface on which fill is to be placed shall be free of all <br /> 25 vegetation, debris, or other objectionable material, and all large roots shall be grubbed out <br /> 26 to a depth of at least 2 feet below base. The surface shall be scarified to a depth of 6 <br /> 27 inches and compacted to at least 95 percent of the maximum dry density. It may be <br /> 28 necessary to adjust the moisture content of the subgrade soil by watering or aeration to , <br /> 29 bring the moisture content of the soil near optimum in order that the specified densities can <br /> 30 be obtained. Surface shall be approved by Engineer before placing fill. <br /> 31 <br /> 32 C. Placement of Fill: Fill materials shall be spread in layers and shall have a uniform moisture i <br /> 33 content that will provide the specified dry density after compaction. If necessary to obtain <br /> 34 uniform distribution of moisture, water shall be added to each layer by sprinkling and the <br /> 35 soil disced, harrowed, or otherwise manipulated after the water is added. If the material is <br /> 36 too wet, the moisture content shall be reduced as necessary by spreading and aerating. <br /> 37 The layers of the fill material shall not exceed 6 inches and each layer shall be compacted <br /> 38 with suitable compaction equipment to provide the specified dry densities. <br /> 39 <br /> 40 The dry density of the compacted fill shall be at least 95 percent of the maximum dry <br /> 41 density. Field density tests shall be performed to check the compaction of the fill materials. <br /> 42 If the dry densities are not satisfactory, the Contractor will be required to increase the <br /> 43 weight of the roller or the number of passes as required to produce the specified densities. <br /> 44 <br /> 45 Where trenches must be excavated in embankments for pipelines, these trenches shall be <br /> 46 excavated when the fill is at least two feet above the top of the pipe and backfilled with the <br /> 47 fill materials excavated. The backfill shall be placed in 6-inch layers and each layer <br /> 48 compacted to provide densities as specified above. Care shall be taken not to damage ' <br /> 49 pipe. Backfill placed adjacent to walls shall be placed in a similar manner to that specified <br /> so for backfill in excavated trenches. <br /> 51 <br /> EMBANKMENT CONSTRUCTION <br /> 062794 02226-2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.